???global.info.a_carregar???
Anabela Tereso is Assistant Professor with Habilitation at the Department of Production and Systems, School of Engineering, University of Minho and Researcher at ALGORITMI Research Centre of the same university. She holds a PhD in Production Engineering and Systems (2002), an MSc in Informatics (1997) and a Graduation in Computer and Systems Engineering (1990), all from the University of Minho. Her PhD was in the area of Project Management and she was responsible for the creation of the Master in Engineering Project Management at the University of Minho, having been director and/or member of the board since 2014. Her research interests are in the areas of Project Management, Risk Management, Decision Analysis, Innovation and Sustainability. She authored over a hundred papers and supervised dozens of M.Sc. and PhD theses. Since 2014 she participates in the evaluation of research projects submitted to FWO (Fonds Wetenschappelijk Onderzoek) - Research Foundation Flanders - Belgium, in the area of Business Economics and Management. She was the main investigator on an FCT financed research project during the years 2005-2008 in the topic "Techniques and Models of Project Evaluation and Management - development of algorithms and software to optimize the allocation of resources in networks of multimodal activities, under stochastic conditions", a researcher in Projects P25 "IGPM - Integrated Global Project Management of Industrialization Projects" (Innovative Car HMI) and P50 "TMIP - Team Management in Industrialization Projects" (Factory of Future), from Bosch - University of Minho co-promotion programs. She is also responsible for the creation of the Portuguese Project Management Observatory, an initiative of APOGEP, the Portuguese Project Management Association.
Identificação

Identificação pessoal

Nome completo
Anabela Pereira Tereso

Nomes de citação

  • Tereso, Anabela Pereira
  • Tereso, A. P.
  • Tereso, Anabela
  • Tereso, Anabela P.

Identificadores de autor

Ciência ID
9E1D-A031-D819
ORCID iD
0000-0001-9802-0074
Google Scholar ID
https://scholar.google.pt/citations?user=OvkBLh0AAAAJ&hl=pt-PT
Researcher Id
F-5121-2011
Scopus Author Id
6507707446

Endereços de correio eletrónico

  • anabelat@dps.uminho.pt (Profissional)

Moradas

  • Universidade do Minho, Escola de Engenharia, Departamento de Produção e Sistemas, 4800-058, Campus de Azurém, Guimarães, Portugal (Profissional)

Websites

Domínios de atuação

  • Ciências da Engenharia e Tecnologias - Outras Ciências da Engenharia e Tecnologias - Outras áreas das Engenharias e Tecnologias

Idiomas

Idioma Conversação Leitura Escrita Compreensão Peer-review
Inglês Utilizador proficiente (C1) Utilizador proficiente (C1) Utilizador proficiente (C1) Utilizador proficiente (C1)
Espanhol; Castelhano Utilizador independente (B1) Utilizador proficiente (C1) Utilizador independente (B1) Utilizador proficiente (C1)
Francês Utilizador elementar (A1) Utilizador independente (B1) Utilizador elementar (A1) Utilizador independente (B1)
Italiano Utilizador elementar (A2) Utilizador elementar (A2) Utilizador elementar (A2) Utilizador elementar (A2) Utilizador elementar (A2)
Formação
Grau Classificação
2023/04/28
Concluído
Engenharia Industrial e de Sistemas (Industrial and Systems Engineering) (Título de Agregado)
Universidade do Minho, Portugal
1999 - 2002
Concluído
Doutoramento em Produção e Sistemas (PhD in Production and Systems) (Doutoramento)
Universidade do Minho, Portugal
"Gestão de Projectos – alocação adaptativa de recursos em redes de actividades multimodais (Project Management - adaptive resource allocation in multimodal activity networks)" (TESE/DISSERTAÇÃO)
Aprovação por unanimidade
1995 - 1997
Concluído
Mestrado em Informática (Master in Computer Science) (Mestrado)
Universidade do Minho, Portugal
"Interfaces e Ambientes de Desenvolvimento de Aplicações Multimédia: um estudo comparativo utilizando o método de especificação gramatical (Multimedia Application Develop Interfaces and Environments: a comparative study using the grammatical specification)" (TESE/DISSERTAÇÃO)
Muito Bom
1984 - 1990
Concluído
Licenciatura em Engenharia de Sistemas e Informática (Degree in Systems Engineering and Computer Science) (Licenciatura)
Universidade do Minho, Portugal
14,4
Percurso profissional

Docência no Ensino Superior

Categoria Profissional
Instituição de acolhimento
Empregador
2002/11 - Atual Professor Auxiliar (Docente Universitário) Universidade do Minho, Portugal
1997/01 - 2002/11 Assistente (Docente Universitário) Universidade do Minho, Portugal
1995/07 - 1997/01 Assistente Estagiário (Docente Universitário) Universidade do Minho, Portugal
1990 - 1994 Leitor (Docente Universitário) Instituto de Ensino Superior Cardeal Saraiva, Portugal

Outras Carreiras

Categoria Profissional
Instituição de acolhimento
Empregador
2004/09 - 2005/07 Técnico Superior (Técnico Superior) União dos Sindicatos do Distrito de Braga, Portugal
1993/09 - 1995/07 Técnico Superior (Técnico Superior) Escola Profissional e Tecnológica do Vale do Ave, Portugal
1993/09 - 1995/07 Técnico Superior (Técnico Superior) Escola Secundária de Carlos Amarante, Portugal
1990/01 - 1994/07 Técnico Superior (Técnico Superior) Instituto de Ensino Superior Cardeal Saraiva, Portugal
1993/01 - 1993/07 Técnico Superior (Técnico Superior) Escola Profissional Noroeste Pioneira, Portugal
1991/01 - 1992/08 Técnico Superior (Técnico Superior) ARP - Auto-Rádios Portuguesa, Lda, Portugal
1987/09 - 1990/07 Técnico Superior (Técnico Superior) Associação Comercial e Industrial da Maia, Portugal

Cargos e Funções

Categoria Profissional
Instituição de acolhimento
Empregador
2020/09/01 - 2022/08/31 Diretora de Mestrado (Master's Director) Universidade do Minho, Portugal
2014/05/07 - 2016/07/31 Diretora de Mestrado (Master's Director) Universidade do Minho, Portugal
Projetos

Bolsa

Designação Financiadores
2021/01 - 2025/12 Laboratório Associado de Sistemas Inteligentes
168241UID
LA/P/0104/2020
Universidade Nova de Lisboa Centro de Tecnologias e Sistemas, Portugal

Universidade de Aveiro Centro de Tecnologia Mecânica e Automação, Portugal

Instituto Politécnico do Porto Centro de Investigação em Sistemas Computacionais Embebidos e de Tempo-Real, Portugal

Universidade do Minho, Portugal

Universidade do Porto Centro de Matemática, Portugal

Universidade do Porto Faculdade de Ciências, Portugal

Universidade do Porto Laboratório de Inteligência Artificial e Ciência de Computadores, Portugal

Universidade Nova de Lisboa, Portugal

Universidade de Aveiro, Portugal

Universidade do Minho Centro ALGORITMI, Portugal

Universidade Nova de Lisboa Unidade de Investigação e Desenvolvimento em Engenharia Mecânica e Industrial, Portugal

Universidade do Minho Instituto de Polímeros e Compósitos, Portugal

Universidade de Aveiro Instituto de Engenharia Eletrónica e Informática de Aveiro, Portugal

Universidade de Coimbra, Portugal

Instituto Politécnico do Porto Instituto Superior de Engenharia do Porto, Portugal

Universidade de Coimbra Departamento de Engenharia Civil, Portugal

Instituto Politécnico do Cávado e do Ave, Portugal

Instituto Politécnico do Porto Grupo de Investigação em Engenharia e Computação Inteligente para a Inovação e o Desenvolvimento, Portugal

Universidade do Porto Faculdade de Engenharia, Portugal
Fundação para a Ciência e a Tecnologia
Em curso

Projeto

Designação Financiadores
2018 - 2021 Project 50 - TMIP: Team Management in Industrialization Projects / Factory of the Future: Smart Manufacturing (UMinho-Bosch)
FCOMP-01-0202-FEDER-036265
Investigador
Universidade do Minho, Portugal
Agência para o Investimento e Comércio Externo de Portugal, E.P.E.
Concluído
2019/01/01 - 2019/12/31 Centro de Investigação ALGORITMI
UID/CEC/00319/2019
Universidade do Minho, Portugal

Universidade do Minho Centro ALGORITMI, Portugal
Fundação para a Ciência e a Tecnologia
Concluído
2015 - 2019 Projeto Plano Estratégico (Strategic Plan Project) ALGORITMI Centre 2015-2019
UID/CEC/00319/2013
Investigador
Universidade do Minho Centro ALGORITMI, Portugal
Fundação para a Ciência e a Tecnologia (FCT)
Concluído
2013 - 2015 Project 25 - igMIP: Integrated and Global Management of Industrialization Projects / IFACTORY / INNOVATIVE CAR HMI (UMinho-Bosch)
POCI-01-0247-FEDER-002814
Investigador
Universidade do Minho, Portugal
Agência para o Investimento e Comércio Externo de Portugal, E.P.E.
Concluído
2012 - 2015 GATOP - Algoritmos Genéticos para o Problema de Orientação de Equipas (Genetic Algorithm for Team Orienteering Problem)
PTDC/EME-GIN/120761/2010
Investigador
Universidade do Minho, Portugal
Fundação para a Ciência e a Tecnologia
Concluído
2014 - 2014 Projeto Plano Estratégico (Strategic Plan Project) CGIT Centre 2014
PEst-OE/EEI/UI0319/2014
Investigador
Universidade do Minho - Centro de Gestão Industrial e da Tecnologia, Portugal
Fundação para a Ciência e a Tecnologia (FCT)
Concluído
2013 - 2013 Projeto Plano Estratégico (Strategic Plan Project) CGIT Centre 2013
PEst-UID/CEC/00319/2013
Investigador
Universidade do Minho - Centro de Gestão Industrial e da Tecnologia, Portugal
Fundação para a Ciência e a Tecnologia
Concluído
2010 - 2013 Planeamento eléctrico sustentável (Sustainable electrical planning)
PTDC/SEN-ENR/099578/2008
Investigador
Universidade do Minho, Portugal
Fundação para a Ciência e a Tecnologia (FCT)
Em curso
2011 - 2012 Projeto Estratégico (Strategic Project) CGIT 2011-12
PEst-OE/EME/UI0252/2011
Investigador
Universidade do Minho - Centro de Gestão Industrial e da Tecnologia, Portugal
Fundação para a Ciência e a Tecnologia (FCT)
Concluído
2005 - 2008 Techniques and Models of Projects Evaluation and Management - Development of Algorithms and Software for Optimal Allocation of Resources in Multimodal Activity Networks, under Stochastic Conditions
Investigador responsável
Universidade do Minho, Portugal
Fundação para a Ciência e a Tecnologia (FCT)
Concluído

Outro

Designação Financiadores
2020 - 2023 Capabilities for delivering projects in the context of societal development (CaProSoc)
-
Investigador
Alma Mater Europaea - ECM
Concluído
Produções

Publicações

Artigo em conferência
  1. Dias, Danna Beatriz Rodrigues; Tereso, Anabela Pereira ; Souza, Ingrid. "Implementing an agile project management methodology on a Minimum Viable Product development". Trabalho apresentado em WorldCist'23 - 11th World Conference on Information Systems and Technologies, Pisa, 2023.
    Publicado
  2. Guerreiro, Rita; André S. Santos; Tereso, Anabela Pereira. "Online Scheduling: A Survey". Trabalho apresentado em CISTI'2023 - 18ª Conferência Ibérica de Sistemas e Tecnologias de Informação (CISTI2023), Aveiro, 2023.
    Publicado
  3. Tereso, Anabela Pereira ; Ana Cristina Braga; Paulo Ferreira Sousa; Mendes, Rui; Miguel Oliveira. "Project Management in Portugal: results of the 2022 pilot study by the Portuguese Project Management Observatory". Trabalho apresentado em CISTI'2023 - 18ª Conferência Ibérica de Sistemas e Tecnologias de Informação (CISTI2023), Aveiro, 2023.
    Publicado
  4. Ferreira, Jose; Sousa, Paulo Ferreira; Tereso, Anabela Pereira. "Problem-solving practices in the automotive industry: an initial framework". Trabalho apresentado em ProjMAN 2023 - International Conference on Project MANagement 2023, Porto, 2023.
    Publicado
  5. Ana Rita Gomes; Tereso, Anabela Pereira ; Rui Dinis Sousa; Paulo Ferreira Sousa. "Stakeholder Management and Communication Management in Non-Governmental Organizations: a systematic literature review". Trabalho apresentado em ProjMAN 2023 - International Conference on Project MANagement 2023, Porto, 2023.
    Publicado
  6. Fernandes, Tiago; Tereso, Anabela Pereira ; Rui Dinis Sousa; Paulo Ferreira Sousa. "Defining and Improving the Processes of the Portuguese Project Management Observatory". Trabalho apresentado em ProjMAN 2023 - International Conference on Project MANagement 2023, Porto, 2023.
    Publicado
  7. Inês Castro Fernandes; de Sá-Soares, Filipe; Tereso, Anabela Pereira ; Paulo Ferreira Sousa. "Governance Models for Non-Profit Organizations: a literature review". Trabalho apresentado em CENTERIS 2023 - International Conference on ENTERprise Information Systems 2023, Porto, 2023.
    Publicado
  8. Vânia Novo; Tereso, Anabela Pereira ; Paulo Ferreira Sousa; Ribeiro-Lopes, Sofia; Engrácia, Pedro. "Application of the PM² Programme Management Methodology to the Portuguese Project Management Observatory". Trabalho apresentado em WorldCist'23 - 11th World Conference on Information Systems and Technologies, Pisa, 2023.
    Publicado
  9. Lima Jr., Orlando; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Práticas e Benefícios da Inovação e Sustentabilidade na Gestão de Projetos nas PME: uma revisão sistemática da literatura". Trabalho apresentado em PM SUMMIT Lisbon 2022 - PM Symposium: Sustentabilidade em Gestão de Projetos, Lisboa, 2022.
    Publicado
  10. Marques, Patricia; Paulo Ferreira Sousa; Tereso, Anabela Pereira. "Sustentabilidade na Gestão de Projetos: estudo comparativo PM²/PRiSM". Trabalho apresentado em PM SUMMIT Lisbon 2022 - PM Symposium: Sustentabilidade em Gestão de Projetos, Lisboa, 2022.
    Publicado
  11. Giselle Ferreira; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Project Management in Service Sector SMEs: a comparative study between Portugal and Denmark". Trabalho apresentado em WorldCist'22 - 10th World Conference on Information Systems and Technologies, Budva, 2022.
    Publicado
  12. Pinto, Leandro; Pereira, Alberto; Tereso, Anabela Pereira ; Brito, Marlene. "Application of scheduling and capacity management tools in a multi-project environment". Trabalho apresentado em WorldCist'22 - 10th World Conference on Information Systems and Technologies, Budva, 2022.
    Publicado
  13. Lima Jr., Orlando; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Innovation and Sustainability Practices in Project Management within SMEs Context - a systematic literature review". Trabalho apresentado em WorldCist'22 - 10th World Conference on Information Systems and Technologies, Budva, 2022.
    Publicado
  14. Fernandes, Inês Xavier; de Sá-Soares, Filipe; Tereso, Anabela Pereira. "Modelling and Analysing Product Development Processes in the Textile and Clothing Industry". Trabalho apresentado em ICIE 2022 (International Conference Innovation in Engineer 2022), Guimarães, 2022.
    Publicado
  15. Barbosa, João; Fernandes, Gabriela; Tereso, Anabela Pereira. "Benefits of University-Industry R&D Collaborations: A Systematic Literature Review". Trabalho apresentado em ICIE 2022 (International Conference Innovation in Engineer 2022), Guimarães, 2022.
    Publicado
  16. Miranda, Catarina; Tereso, Anabela Pereira ; Gonçalves, A. Manuela; Paulo Ferreira Sousa; Engrácia, Pedro. "Study on project management in Portugal within the scope of the Portuguese Project Management Observatory". Trabalho apresentado em ProjMAN 2022 - International Conference on Project MANagement 2022, Lisboa, 2022.
    Publicado
  17. Machado, Diogo; Tereso, Anabela Pereira ; Afonso, Paulo. "Ratio Project Planning: cost optimization projects in the production phase". Trabalho apresentado em ProjMAN 2022 - International Conference on Project MANagement 2022, Lisboa, 2022.
    Publicado
  18. Dinis, Cláudia; Pedro Eduardo Ribeiro; Tereso, Anabela Pereira. "A Project Management Hybrid Model of Software Development in an Academic Environment". Trabalho apresentado em WorldCist'21 - 9th World Conference on Information Systems and Technologies, Terceira Island, Azores, 2021.
    Publicado
  19. Watanabe, Cristiano Seiji; Fernandes, Gabriela; Jespersen, Lars; Vestgaard, Jens. "Project management practice in SMEs: A comparative study of the Portuguese and Danish economic context". Trabalho apresentado em WorldCist'21 - 9th World Conference on Information Systems and Technologies, Terceira Island, Azores, 2021.
    Publicado
  20. Fernandes, Gabriela; Domingues, Joana; Tereso, Anabela Pereira ; Eduardo B. Pinto. "Critical Management Risks in Collaborative University-Industry R&D Programs". Trabalho apresentado em WorldCist'21 - 9th World Conference on Information Systems and Technologies, Terceira Island, Azores, 2021.
    Publicado
  21. Fernandes, Gabriela; Capitão, Marlene Cachada; Tereso, Anabela Pereira ; Oliveira, José; Eduardo B. Pinto. "Stakeholder Management in University-Industry Collaboration Programs: A Case Study". Trabalho apresentado em International Conference Innovation in Engineering 2021 (ICIE2021), Guimarães, 2021.
    Publicado
  22. Ribeiro-Lopes, Sofia; Tereso, Anabela Pereira ; Ferreira, José Luís; Paulo Ferreira Sousa; Engrácia, Pedro. "Application of the PM² Methodology in the Project Management of the Portuguese Project Management Observatory Creation - Initiating Phase". Trabalho apresentado em ProjMAN 2021 - International Conference on Project MANagement 2021, Braga, 2021.
    Publicado
  23. Marzieh AGHILEH; Tereso, Anabela Pereira ; Fernandes, Gabriela; Araujo, Madalena; Carvalho, Hugo; Almeida, Joana; Victor PAIS. "A Capacity Management Tool for Industrialization Projects". Trabalho apresentado em 38th IBIMA Conference, Seville, 2021.
    Publicado
  24. Frederico ARAUJO; Tereso, Anabela Pereira ; Cormican, Kathryn. "Differences between managing traditional projects and innovation projects". Trabalho apresentado em 38th IBIMA Conference, Seville, 2021.
    Publicado
  25. Miranda, João Luís Lima Pinho; Tereso, Anabela Pereira ; Teixeira, José Manuel Cardoso. "Multicriteria analysis as a better tool for the selection of public projects alternatives". Trabalho apresentado em ProjMAN 2020 (International Conference on Project MANagement 2020), Vilamoura, Algarve, 2020.
    Publicado
  26. Tereso, Anabela Pereira ; Mishly, M.A.. "Innoframe: A project and portfolio management multilayer framework to support innovation-driven SMEs". Trabalho apresentado em ICQEM 2020 (International Conference on Quality Engineering and Management 2020), Guimarães, 2020.
    Publicado
  27. Lima, Caio; Tereso, Anabela Pereira ; Araujo, Madalena. "Development of a capacity management tool for the portfolio of industrialization projects: a case study in the automotive industry". Trabalho apresentado em WorldCIST 2020 - 8th World Conference on Information Systems and Technologies, Budva, 2020.
    Publicado
  28. Souza, Ingrid; Tereso, Anabela Pereira ; Mesquita, Diana. "Communication in Project Management: an action research approach in an automotive manufacturing company". Trabalho apresentado em WorldCIST 2020 - 8th World Conference on Information Systems and Technologies, Budva, 2020.
    Publicado
  29. Fernandes, Gabriela; Domingues, Joana; Tereso, Anabela Pereira ; Eduardo B. Pinto. "A Stakeholders' Perspective on Risk Management for Collaborative University-Industry R&D Programs". Trabalho apresentado em ProjMAN 2020 - International Conference on Project MANagement, Vilamoura, Algarve, 2020.
    Publicado
  30. Pires, Sara; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Improving Project Management Practices in a Software Development Team". Trabalho apresentado em WorldCIST 2020 - 8th World Conference on Information Systems and Technologies, Budva, 2020.
    Publicado
  31. Tereso, Anabela Pereira ; Mishly, M.A.. "Innoframe: a project and portfolio management multilayer framework to support innovation-driven SMEs". Trabalho apresentado em 4th International Conference on Quality Engineering and Management, Guimarães, 2020.
    Publicado
  32. Gonçalves, M.H.; Tereso, Anabela Pereira ; Costa, H.R.. "Project Risk Management in an Automotive Company". Trabalho apresentado em 4th International Conference on Quality Engineering and Management, Guimarães, 2020.
    Publicado
  33. Catarina Teixeira; Tereso, Anabela Pereira ; Isabel Lopes; Manuel Carlos Barbosa Figueiredo. "A comparison of multi-criteria methods for spare parts classification". Trabalho apresentado em 34rd IBIMA Conference, Madrid, 2019.
    Publicado
  34. Felipe Saldanha; Tereso, Anabela Pereira ; Anabela Carvalho Alves; Miguel Queiros. "Improvement of project management processes and practices aided by lean tools in a metalworking company". Trabalho apresentado em 34rd IBIMA Conference, Madrid, 2019.
    Publicado
  35. Adriana Fernandes; Tereso, Anabela Pereira ; Manuel Lopes Nunes. "New Product Development Project Management Practices Improvement in a Textile Company". Trabalho apresentado em 34rd IBIMA Conference, Madrid, 2019.
    Publicado
  36. Prazeres, R.; Tereso, A.; Silva, H.. "A study on the application of project management practices to higher education management in Brazilian federal institutes and universities". Trabalho apresentado em 33rd IBIMA Conference, Granada, 2019.
    Publicado
  37. Alves, P.R.; Tereso, A.; Fernandes, G.. "Project management system implementation in SMEs: A case study". Trabalho apresentado em 33rd IBIMA Conference, Granada, 2019.
    Publicado
  38. Fernandes, G.; Sousa, H.; Tereso, A.. "The functions and responsibilities of a project management office to support university research centers". Trabalho apresentado em 33rd IBIMA Conference, Granada, 2019.
    Publicado
  39. Silva, B.; Tereso, A.; Amaral, A.. "Analysis of project management practices within the textile and clothing industry". Trabalho apresentado em 33rd IBIMA Conference, Granada, 2019.
    Publicado
  40. Mucambe, B.; Tereso, A.; Faria, J.; Mateus, T.. "Large-scale agile frameworks: Dealing with interdependences". Trabalho apresentado em 33rd IBIMA Conference, Granada, 2019.
    Publicado
  41. Oliveira, E.; Tereso, A.; Santos, C.. "Application of a risk management methodology in industrial projects: A case study in the metalworking sector". Trabalho apresentado em 33rd IBIMA Conference, Granada, 2019.
    Publicado
  42. Fernandes, Diana; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Improvement of Industrialization Projects Management: An Automotive Industry Case Study". Trabalho apresentado em WorldCIST’19 - 7th World Conference on Information Systems and Technologies, La Toja Island, Galicia, 2019.
    Publicado
  43. Meirelles, Eliane Gonzales; Tereso, Anabela Pereira ; Santos, Claúdio. "The Importance of Project Management Competences: A Case Study in Public Administration". Trabalho apresentado em WorldCIST’19 - 7th World Conference on Information Systems and Technologies, La Toja Island, Galicia, Spain, 2019.
    Publicado
  44. Tereso, Anabela Pereira ; Leão, Celina Pinto; Ribeiro, Tobias. "Project Management Practices at Portuguese Startups". Trabalho apresentado em WorldCIST’19 - 7th World Conference on Information Systems and Technologies, La Toja Island, Galicia, Spain, 2019.
    Publicado
  45. Lima, Ricardo; Tereso, Anabela Pereira ; Faria, Joao. "Project management under uncertainty: resource flexibility visualization in the schedule". Trabalho apresentado em ProjMAN 2019 - International Conference on Project MANagement 2019, Sousse, 2019.
    Publicado
  46. Pereira, Maria; Anabela P Tereso; Araujo, Madalena; Faria, Joao. "Development of a Framework for Managing Capacities and Schedules in Industrialization Projects: a case study in the automotive domain". Trabalho apresentado em ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation, 2018.
    Publicado
  47. Cabecinhas, Monica; Anabela P Tereso. "The Application of Multicriteria Decision Analysis in an ISO 9001 Implementation Problem". Trabalho apresentado em ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation, 2018.
    Publicado
  48. Carvalho, Hugo; Anabela P Tereso; Fernandes, Gabriela; Faria, Joao; Barbosa, Jose. "Stakeholder Management in Industrialization Projects: an automotive industry case study". Trabalho apresentado em ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation, 2018.
    Publicado
  49. Rodrigues, Bruno; Araujo, Madalena; Anabela P Tereso; Faria, Joao; Assis, Paulo. "Improving Risk Management Practice in Industrialization Projects: case study of an automotive company". Trabalho apresentado em ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation, Guimarães, 2018.
    Publicado
  50. Alshelh, Lina; Anabela P Tereso. "Ten Leadership Factors Interconnection Power Towards Project Success in SMEs". Trabalho apresentado em ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation, Guimarães, 2018.
    Publicado
  51. Mican, Camilo; Tereso, Anabela; Aldora Gabriela Fernandes; Araujo, Madalena. "Project Portfolio Selection in a Colombian Holding Company". Trabalho apresentado em ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation, Guimarães, 2018.
    Publicado
  52. Ribeiro, Joana; Aldora Gabriela Fernandes; Tereso, Anabela. "Risks, Issues and Critical Success Factors in Shared Service Center Projects". Trabalho apresentado em ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation, Guimarães, 2018.
    Publicado
  53. Reis, Andreia Carina Sousa; Tereso, Anabela Pereira ; Santos, Claúdio; Coelho, Jorge. "Development of an interface for managing and monitoring projects in an automotive company". Trabalho apresentado em WorldCIST’18 - 6th World Conference on Information Systems and Technologies, Naples, 2018.
    Publicado
  54. Almeida, Ana; Tereso, Anabela Pereira ; Ruão, Teresa; Faria, Joao. "Knowledge Sharing in Industrialization Project Management Practices". Trabalho apresentado em WorldCIST’18 - 6th World Conference on Information Systems and Technologies, Naples, 2018.
    Publicado
  55. Ribeiro, Francisca; Tereso, Anabela Pereira ; Andrade, Deborah. "Development of a grooming process for an agile software team in the automotive domain". Trabalho apresentado em WorldCIST’18 - 6th World Conference on Information Systems and Technologies, Naples, 2018.
    Publicado
  56. Paulo Ferreira Sousa; Tereso, Anabela Pereira ; Alves, Anabela; Gomes, Liliana. "Implementation of project management and lean production practices in a SME Portuguese innovation company". Trabalho apresentado em ProjMAN 2018 - International Conference on Project MANagement 2018, Lisbon, 2018.
    Publicado
  57. Perrotta, Deborah; Fernandes, Gabriela; Araujo, Madalena; Tereso, Anabela; Faria, Joao. "Usefullness of project management practices in industrialization projects – A case study". Trabalho apresentado em 23rd ICE/IEEE International Technology Management Conference, Madeira Island, 2017.
    Publicado • 10.1109/ice.2017.8280005
  58. Costa, Irene; Fernandes, Gabriela; Tereso, Anabela. "Integration of project management with NPD process: a metalworking company case study". Trabalho apresentado em 23rd ICE/IEEE International Technology Management Conference, 2017.
    Publicado • 10.1109/ice.2017.8280016
  59. Carvalho, S.V.; Tereso, A.P.; Fernandes, G.. "Improving project management practice: An engineering and construction case study". Trabalho apresentado em IEEM2017 - IEEE International Conference on Industrial Engineering and Engineering Management 2017, Singapore, 2017.
    Publicado • 10.1109/IEEM.2017.8290197
  60. Perrotta, D.; Faria, J.; Araújo, M.; Tereso, A.; Fernandes, G.. "Project change request: A proposal for managing change in industrialization projects". Trabalho apresentado em IEEM2017 - IEEE International Conference on Industrial Engineering and Engineering Management 2017, Singapore, 2017.
    Publicado • 10.1109/IEEM.2017.8290148
  61. Soares, João; Tereso, Anabela Pereira ; Sousa, Sérgio Dinis Teixeira de. "Use of Analytic Hierarchy Process (AHP) to Support the Decision-Making about Destination of a Batch of Defective Products with Alternatives of Rework and Discard". Trabalho apresentado em IO2017 - XVIII Congresso da Associação Portuguesa de Investigação Operacional, Valença, 2017.
    Publicado
  62. Sousa, Cátia; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Improving Project Management Practices in Architecture & Design Offices". Trabalho apresentado em WorldCist'17 - 5th World Conference on Information Systems and Technologies, Porto Santo Island, Madeira, 2017.
    Publicado
  63. Tereso, Anabela Pereira ; Pedro Ribeiro; Cardoso, Manuel. "Integration Between EVM and Risk Management: Proposal of an Automated Framework". Trabalho apresentado em WorldCist'17 - 5th World Conference on Information Systems and Technologies, Porto Santo Island, Madeira, 2017.
    Publicado
  64. Catarina Oliveira; Tereso, Anabela Pereira ; Fernandes, Gabriela. "PMO Conceptualization for Engineering and Construction Businesses". Trabalho apresentado em ProjMAN 2017 - International Conference on Project MANagement 2017, Barcelona, 2017.
    Publicado
  65. Perrota, Deborah ; Araújo, Madalena; Fernades, Gabriela; Tereso, Anabela Pereira ; Faria, João. "Towards the development of a methodology for managing industrialization projects". Trabalho apresentado em ProjMAN 2017 - International Conference on Project MANagement 2017, Barcelona, 2017.
    Publicado
  66. Ribeiro, Eduardo; Tereso, Anabela Pereira. "The application of a decision model in the management of raw material costs". Trabalho apresentado em ICOPEV 2016 - 3rd International Conference on Project Evaluation, Guimarães, 2016.
    Publicado
  67. Mishly, Mohamad; Tereso, Anabela Pereira. "Preliminary Research Plan Towards a Project and Portfolio Management Framework to Support Innovation-Driven SMEs". Trabalho apresentado em ICOPEV 2016 - 3rd International Conference on Project Evaluation, Guimarães, 2016.
    Publicado
  68. Faria, João Manuel Peixoto; Araújo, Maria Madalena Teixeira de; Tereso, Anabela Pereira. "Project Management Under Uncertainty: Solution methods revisited". Trabalho apresentado em ICOPEV 2016 - 3rd International Conference on Project Evaluation, Guimarães, 2016.
    Publicado
  69. Ferreira, Helena; Tereso, Anabela Pereira; Fernandes, Aldora Gabriela Gomes. "Conceptualization of Project Management Offices Structures". Trabalho apresentado em ICOPEV 2016 - 3rd International Conference on Project Evaluation, Guimarães, 2016.
    Publicado
  70. Sá, V.; Tereso, A.. "Implementation of project management practices in the direct purchasing system of a company". Trabalho apresentado em 28th IBIMA Conference, Seville, 2016.
    Publicado
  71. Mishly, M.A.; Tereso, A.. "Primary roadmap towards a project and portfolio management framework to support innovation-driven SMEs". Trabalho apresentado em 28th IBIMA Conference, Seville, 2016.
    Publicado
  72. Kisly, Dmitry; Tereso, Anabela Pereira ; Carvalho, Maria Sameiro. "Multiple case study of the supplier selection decision process". Trabalho apresentado em WorldCIST'16 – 4th World Conference on Information Systems and Technologies, Recife, 2016.
    Publicado
  73. Kisly, Dmitry; Tereso, Anabela Pereira ; Carvalho, Maria Sameiro. "Implementation of multiple criteria decision analysis approaches in the supplier selection process: a case study". Trabalho apresentado em WorldCIST'16 – 4th World Conference on Information Systems and Technologies, Recife, 2016.
    Publicado
  74. Andrade, Rita; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Benefits Management in University-Industry R&D Collaborative Projects: A Review on Benefits and Success Factors". Trabalho apresentado em ProjMAN 2016 - International Conference on Project MANagement, Porto, 2016.
    Publicado
  75. Mishly, Mohamad; Tereso, Anabela Pereira. "Primary Roadmap Towards a Project and Portfolio Management Framework to Support Innovation-Driven SMEs". Trabalho apresentado em 28th IBIMA Conference, Seville, 2016.
    Publicado
  76. Rocha, António Miguel Sousa; Tereso, Anabela Pereira; Ferreira, Paula Varandas. "Decision methods applied to solve a safety problem on a waste treatment facility". Trabalho apresentado em 3rd International Conference WASTES: Solutions, Treatments and Opportunities, Viana do Castelo, 2015.
    Publicado
  77. Faria, J.M.P.; Araújo, M.M.T.; Tereso, A.P.. "Project management under uncertainty: a study on solution methods". Trabalho apresentado em 26th IBIMA Conference, Madrid, 2015.
    Publicado
  78. Junkes, M.B.; Tereso, A.P.; Afonso, P.S.L.P.. "The Importance of Risk Assessment in the Context of Investment Project Management: A Case Study". Trabalho apresentado em ProjMAN 2015 - International Conference on Project MANagement, Vilamoura, 2015.
    Publicado • 10.1016/j.procs.2015.08.606
  79. Ferreira, João; Costa, Miguel; Tereso, Anabela Pereira ; Oliveira, José A.. "A Multi-Criteria Decision Support System for a Routing Problem in Waste Collection". Trabalho apresentado em EMO2015 - 8th International Conference on Evolutionary Multi-Criterion Optimization, Guimarães, 2015.
    Publicado
  80. Tereso, Anabela Pereira ; Amorim, João. "BeSmart2: A multicriteria decision aid application". Trabalho apresentado em WorldCIST'15 - 3rd World Conference on Information Systems and Technologies, Ponta Delgada, São Miguel, Azores, 2015.
    Publicado
  81. Rocha, Leonel; Tereso, Anabela Pereira ; Couto, João Pedro. "Project Management: Evaluation of the problems in the Portuguese construction industry". Trabalho apresentado em WorldCIST'15 - 3rd World Conference on Information Systems and Technologies, Ponta Delgada, São Miguel, Azores, 2015.
    Publicado
  82. David Silva; Tereso, Anabela Pereira ; Fernandes, Gabriela; Loureiro, Isabel; Pinto, Jose Angelo. "OPM3® Portugal Project - Information Systems and Technologies Organizations - Outcome Analysis". Trabalho apresentado em WorldCIST'15 - 3rd World Conference on Information Systems and Technologies, Ponta Delgada, São Miguel, Azores, 2015.
    Publicado
  83. Moutinho, Rui; Tereso, Anabela Pereira. "Concurrency Detection on Finish-to-Start Activity Precedence Networks". Trabalho apresentado em WorldCIST'15 - 3rd World Conference on Information Systems and Technologies, Ponta Delgada, São Miguel, Azores, 2015.
    Publicado
  84. Margarida Dias; Anabela Pereira Tereso; Ana Cristina Braga; A. Gabriela Fernandes. "The Key Project Managers' Competences for Different Types of Projects". Trabalho apresentado em The 2014 World Conference on Information Systems and Technologies (WorldCIST’14), Madeira, 2014.
    Publicado • 10.1007/978-3-319-05951-8_34
  85. Ferreira, Maria Ester; Anabela Pereira Tereso. "Software Tools for Project Management - Focus on Collaborative Management". Trabalho apresentado em The 2014 World Conference on Information Systems and Technologies (WorldCIST'14), Madeira, 2014.
    Publicado
  86. Oliveira, Juliana; Anabela Pereira Tereso; Machado, Ricardo J.. "An Application to Select Collaborative Project Management Software Tools". Trabalho apresentado em The 2014 World Conference on Information Systems and Technologies (WorldCIST'14), Madeira, 2014.
    Publicado
  87. Junkes, Maria Bernadete; Anabela Pereira Tereso; Afonso, Paulo. "Case study approach in engineering classes: methodologies, strategies and recommendations for teachers and students - insights from the case "Banco da Amazônia"". Trabalho apresentado em Project Approaches in Engineering Education 2014 (PAEE 2014), Medellín, 2014.
    Publicado
  88. David Silva; Tereso, Anabela Pereira ; Aldora Gabriela Gomes Fernandes; Pinto, Jose Angelo. "OPM3® Portugal Project: Analysis of Preliminary Results". Trabalho apresentado em ProjMAN 2014 - International Conference on Project MANagement, Troia, 2014.
    Publicado
  89. Peixoto, Joana; Tereso, Anabela Pereira ; Aldora Gabriela Gomes Fernandes; Almeida, Rui. "Project Risk Management Methodology: A Case Study of an Electric Energy Organization". Trabalho apresentado em ProjMAN 2014 - International Conference on Project MANagement, Troia, 2014.
    Publicado
  90. Moutinho, Rui; Tereso, Anabela Pereira. "Scheduling of Multimodal Activities with Multiple Renewable and Availability Constrained Resources under Stochastic Conditions". Trabalho apresentado em ProjMAN 2014 - International Conference on Project MANagement, Troia, 2014.
    Publicado
  91. Serrano, Vítor; Tereso, Anabela Pereira; Ribeiro, Pedro; Brito, Miguel. "Standardization of Processes Applying CMMI Best Practices". Trabalho apresentado em The 2013 World Conference on Information Systems and Technologies (WorldCIST'13), Algarve, 2013.
    Publicado • 10.1007/978-3-642-36981-0_42
  92. Ferreira, Mafalda; Tereso, Anabela Pereira; Ribeiro, Pedro Miguel Gonzalez de Abreu; Fernandes, Gabriela; Loureiro, Isabel. "Project Management Practices in Private Portuguese Organizations". Trabalho apresentado em ProjMAN 2013 – International Conference on Project MANagement, Lisboa, 2013.
    Publicado • 10.1016/j.protcy.2013.12.067
  93. Simões, Jorge; Tereso, Anabela Pereira; Figueiredo, Manuel. "Improving Supply Chain Management in the Clothing Industry". Trabalho apresentado em XI Congreso Galego de Estatística e Investigación de Operacións (XISGAPEIO’2013), A Coruña - Spain, 2013.
    Publicado
  94. Carvalho, Élia; Figueiredo, Manuel; Tereso, Anabela Pereira. "Inventory Management in the Footwear Industry". Trabalho apresentado em XI Congreso Galego de Estatística e Investigación de Operacións (XISGAPEIO’2013), A Coruña, 2013.
    Publicado
  95. Rocha, António; Tereso, Anabela Pereira; Ferreira, Paula. "PROV Exponential Decision Method". Trabalho apresentado em World Congress on Engineering (WCE 2012), London, 2012.
    Publicado
  96. Hussain, Deedar; Figueiredo, Manuel; Tereso, Anabela Pereira; Ferreira, Fernando. "Strategic Planning for the Textile and Clothing Supply Chain". Trabalho apresentado em World Congress on Engineering (WCE 2012), London, 2012.
    Publicado
  97. Junkes, Maria Bernadete; Tereso, Anabela Pereira; Afonso, Paulo. "The Role of Engineering Economics in the Evaluation of Investment Projects by the Bank of Amazon-Brazil". Trabalho apresentado em International Conference on Industrial Engineering and Operations Management 2012 (ICIEOM2012), Guimarães, 2012.
    Publicado
  98. Tereso, Anabela Pereira; Junkes, Maria Bernadete; Afonso, Paulo. "Current Practice and Teaching of Engineering Economics in Brazilian Universities". Trabalho apresentado em Fourth International Symposium on Project Approaches in Engineering Education (PAEE 2012), São Paulo, 2012.
    Publicado
  99. Silva, Helder; Tereso, Anabela Pereira; Oliveira, José António. "Sequencing Activities in a Project Network using Resource Complementarity Model". Trabalho apresentado em 4th International Conference on Information Systems, Logistics and Supply Chain (ILS 2012), Quebec, 2012.
    Publicado
  100. Silva, Helder; Tereso, Anabela Pereira; Oliveira, José António. "Sequencing Activities in a Project Network considering Resource Complementarity". Trabalho apresentado em 3rd International Conference on Engineering Optimization (EngOpt 2012), Rio de Janeiro, 2012.
    Publicado
  101. Hussain, Deedar; Ferreira, Fernando; Figueiredo, Manuel; Tereso, Anabela Pereira. "A Study of the Time Elements in a Textile and Clothing Supply Chain". Trabalho apresentado em 12th AUTEX World Textile Conference, Zadar, 2012.
    Publicado
  102. Hussain, Deedar; Ferreira, Fernando; Figueiredo, Manuel; Tereso, Anabela Pereira. "A Study on the Time Elements in a Textile and Clothing Supply Chain". Trabalho apresentado em 12th AUTEX World Textile Conference, Zadar, 2012.
    Publicado
  103. Rocha, Antonio; Tereso, Anabela Pereira ; Paula Ferreira. "PROV Exponential decision method". Trabalho apresentado em World Congress on Engineering (WCE 2012), Londres, 2012.
    Publicado
  104. Silva, Helder; Oliveira, Jose; Tereso, Anabela. "A Genetic Algorithm for Project Scheduling in Activity Networks under Resource Complementarity". Trabalho apresentado em 17th European Concurrent Engineering Conference (ECEC’2011), London, 2011.
    Publicado
  105. Santos, Mónica; Tereso, Anabela Pereira. "On the Multi-Mode, Multi-Skill Resource Constrained Project Scheduling Problem - Computational Results". Trabalho apresentado em 1st International Conference on Project Economic Evaluation (ICOPEV’2011), Guimarães, 2011.
    Publicado
  106. Silva, Helder; Tereso, Anabela Pereira; Oliveira, José António. "Sequencing Activities in a Project Network with Resource Complementarity: Further Results". Trabalho apresentado em X Congreso Galego de Estatística e Investigación de Operacións (XSGAPEIO’2011), Pontevedra, 2011.
    Publicado
  107. Hussain, Deedar; Figueiredo, Manuel; Tereso, Anabela Pereira; Ferreira, Fernando. "Textile and Clothing Supply Chain Management: Use of Planning-Link in the Strategic Planning Process". Trabalho apresentado em X Congreso Galego de Estatística e Investigación de Operacións (XSGAPEIO’2011), Pontevedra, 2011.
    Publicado
  108. Tereso, Anabela Pereira; Sampaio, Ana; Frade, Hugo; Costa, Miguel; Abreu, Tiago. "beSMART: a software tool to support the selection of decision software". Trabalho apresentado em International Conference on Engineering UBI2011 (ICEUBI2011), Covilhã, 2011.
    Publicado
  109. Tereso, Anabela Pereira; Macedo, Ricardo; Abreu, Rafael; Brandão, João; Martins, Henrique. "Which Soft? Decision Support Software". Trabalho apresentado em International Conference on Engineering UBI2011 (ICEUBI2011), Covilhã, 2011.
    Publicado
  110. Hussain, Deedar; Figueiredo, Manuel; Tereso, Anabela Pereira; Ferreira, Fernando. "Competitiveness in the Textile and Clothing Supply Chain". Trabalho apresentado em International Conference on Engineering UBI2011 (ICEUBI2011), Covilhã, 2011.
    Publicado
  111. Tereso, Anabela Pereira ; Moutinho, Rui. "Capture and Maintenance of Projects Total Cost Minimization Applications' Results". Trabalho apresentado em 5th Iberian Conference on Information Systems and Technologies (CISTI2010), 2010.
    Publicado
  112. Tereso, Anabela Pereira; Barreiro, Duarte; Araújo, Maria Madalena; Elmaghraby, Salah. "On The Optimal Resource Allocation in Projects Considering the Time Value of Money". Trabalho apresentado em Third International Conference on Information Systems, Logistics and Supply Chain, Casablanca, 2010.
    Publicado
  113. Seixedo, Cristina; Tereso, Anabela Pereira. "A Multicriteria Decision Aid Software Application for selecting MCDA Software using AHP". Trabalho apresentado em 2nd International Conference on Engineering Optimization, Lisboa, 2010.
    Publicado
  114. Santos, Mónica; Tereso, Anabela Pereira. "On the Multi-Mode, Multi-Skill Resource Constraint Project Scheduling Problem (MRCPSP-MS)". Trabalho apresentado em 2nd International Conference on Engineering Optimization, Lisboa, 2010.
    Publicado
  115. Hussain, Deedar; Figueiredo, Manuel; Tereso, Anabela Pereira; Ferreira, Fernando. "A Study of Textile & Clothing Supply Chain in Pakistan". Trabalho apresentado em 2nd International Conference on Engineering Optimization, Lisboa, 2010.
    Publicado
  116. Silva, Helder; Tereso, Anabela Pereira; Oliveira, José António. "On Resource Complementarity in Activity Networks - Further Results". Trabalho apresentado em 2nd International Conference on Engineering Optimization, Lisboa, 2010.
    Publicado
  117. Moutinho, Rui; Tereso, Anabela Pereira. "Multiple Resources Allocation under Stochastic Conditions on Projects with Multimodal Activities". Trabalho apresentado em 2nd International Conference on Engineering Optimization, Lisboa, 2010.
    Publicado
  118. Santos, Mónica; Tereso, Anabela Pereira. "On The Multi-Mode, Multi-Skill Resource Constrained Project Scheduling Problem: A Software Application". Trabalho apresentado em WSC15 - The 15th Online World Conference on Soft Computing in Industrial Applications WWW, International, 2010.
    Publicado • 10.1007/978-3-642-20505-7_21
  119. Helder, Silva; Tereso, Anabela Pereira ; Oliveira, José António. "On Resource Complementarity in Activity Networks". Trabalho apresentado em Third International Conference on Information Systems, Logistics and Supply Chain (ILS 2010), Casablanca, 2010.
    Publicado
  120. Tereso, Anabela Pereira; Araújo, Maria Madalena; Moutinho, Rui; Elmaghraby, Salah. "Quantity Oriented Resource Allocation Strategy on Multiple Resources Projects under Stochastic Conditions". Trabalho apresentado em International Conference on Industrial Engineering and Systems Management, Montreal, 2009.
    Publicado
  121. Tereso, Anabela Pereira; Araújo, Maria Madalena; Moutinho, Rui; Elmaghraby, Salah. "Duration Oriented Resource Allocation Strategy on Multiple Resources Projects under Stochastic Conditions". Trabalho apresentado em International Conference on Industrial Engineering and Systems Management, Montreal, 2009.
    Publicado
  122. Tereso, Anabela Pereira; Cardoso, João Paulo; Cabral, José Pedro. "Activity on Arc Network Graphic Editor". Trabalho apresentado em International Conference on Industrial Engineering and Systems Management, Montreal, 2009.
    Publicado
  123. Tereso, Anabela Pereira; Araújo, Maria Madalena; Moutinho, Rui; Elmaghraby, Salah. "Project Management: multiple resources allocation". Trabalho apresentado em International Conference on Engineering Optimization, Rio de Janeiro, 2008.
    Publicado
  124. Rocha, Diana; Tereso, Anabela Pereira. "Utilização de ferramentas informáticas na gestão de projectos". Trabalho apresentado em 5º Congresso Luso-Moçambicano de Engenharia, Maputo, 2008.
    Publicado
  125. Tereso, Anabela Pereira; Costa, Lino; Araújo, Maria Madalena. "The Optimal Resource Allocation in Stochastic Activity Networks via the Evolutionary Approach: a platform implementation in Java". Trabalho apresentado em International Conference on Industrial Engineering and Systems Management, Pequim, 2007.
    Publicado
  126. Vicente, Marco ; Araújo, Maria Madalena; Tereso, Anabela Pereira. "Development of a Performance Evaluation System Applied to a Textile Manufacturing Company". Trabalho apresentado em International Conference on Industrial Engineering and Systems Management, Marrakech, 2005.
    Publicado
  127. Tereso, Anabela Pereira; Araújo, Maria Madalena; Elmaghraby, Salah. "The Optimal Resource Allocation in Stochastic Activity Networks via the Electromagnetism Approach". Trabalho apresentado em Ninth International Workshop on Project Management and Scheduling, Nancy, 2004.
    Publicado
  128. Tereso, Anabela Pereira; Araújo, Maria Madalena; Elmaghraby, Salah. "Experimental Results of an Adaptive Resource Allocation Technique to Stochastic Multimodal Projects". Trabalho apresentado em International Conference on Industrial Engineering and Production Management, Porto, 2003.
    Publicado
Artigo em revista
  1. Aghileh, Marzieh; Tereso, Anabela; Alvelos, Filipe; Monteiro Lopes, Maria Odete. "Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review". Production & Manufacturing Research 12 1 (2024): http://dx.doi.org/10.1080/21693277.2024.2319574.
    Publicado • 10.1080/21693277.2024.2319574
  2. Marques, Patrícia; Sousa, Paulo; Tereso, Anabela Pereira. "Sustainability in Project Management: PM² versus PRiSMTM". Sustainability 15 22 (2023): 15917. http://dx.doi.org/10.3390/su152215917.
    Publicado • 10.3390/su152215917
  3. Lima, Orlando; Fernandes, Gabriela; Tereso, Anabela Pereira. "Benefits of Adopting Innovation and Sustainability Practices in Project Management within the SME Context". Sustainability 15 18 (2023): 13411. http://dx.doi.org/10.3390/su151813411.
    Publicado • 10.3390/su151813411
  4. Tereso, Anabela Pereira ; Fernandes, Gabriela; Araújo, Madalena; Oliveira, Catarina; Ruão, Teresa; Lopes, Ana Isabel; Faria, Joao. "An integrated project management methodology under a social perspective in industrialisation projects". International Journal of Project Organisation and Management 15 1 (2023): 1-30. http://dx.doi.org/10.1504/ijpom.2023.129379.
    Publicado • 10.1504/ijpom.2023.129379
  5. Miranda, Catarina; Tereso, Anabela Pereira ; Gonçalves, A.Manuela; Sousa, Paulo; Engrácia, Pedro. "Study on project management in Portugal within the scope of the Portuguese Project Management Observatory". Procedia Computer Science 219 (2023): 1885-1892. http://dx.doi.org/10.1016/j.procs.2023.01.487.
    Publicado • 10.1016/j.procs.2023.01.487
  6. Machado, Diogo; Tereso, Anabela Pereira ; Afonso, Paulo. "Ratio Project Planning: cost optimization projects in the production phase". Procedia Computer Science 219 (2023): 2003-2010. http://dx.doi.org/10.1016/j.procs.2023.01.501.
    Publicado • 10.1016/j.procs.2023.01.501
  7. Fernandes, Gabriela; Domingues, Joana; Tereso, Anabela Pereira ; Micán, Camilo; Araújo, Madalena. "Risk Management in University-Industry R&D Collaboration Programs: A Stakeholder Perspective". Sustainability 15 1 (2022): 319. http://dx.doi.org/10.3390/su15010319.
    Publicado • 10.3390/su15010319
  8. Macieira, Mónica; Mendonça, Paulo; Miranda Guedes, João; Tereso, Anabela Pereira. "Evaluating the efficiency of membrane's refurbishment solutions to perform vertical extensions in old buildings using a multicriteria decision-support model". Architectural Engineering and Design Management 18 1 (2022): 1-25. http://dx.doi.org/10.1080/17452007.2019.1656597.
    Publicado • 10.1080/17452007.2019.1656597
  9. Ribeiro-Lopes, Sofia; Tereso, Anabela Pereira ; Ferreira, José Luís; Sousa, Paulo; Engrácia, Pedro. "Application of the PM² Methodology in the Project Management of the Portuguese Project Management Observatory Creation – Initiating Phase". Procedia Computer Science 196 (2022): 816-823. http://dx.doi.org/10.1016/j.procs.2021.12.080.
    Publicado • 10.1016/j.procs.2021.12.080
  10. Fernandes, Gabriela; Sousa, Hugo; Tereso, Anabela Pereira ; O’Sullivan, David. "Role of the Project Management Office in University Research Centres". Sustainability 13 21 (2021): 1-17. http://dx.doi.org/10.3390/su132112284.
    Publicado • 10.3390/su132112284
  11. Soares, João Cláudio; Tereso, Anabela Pereira ; Sousa, Sérgio Dinis. "A decision-making model for the rework of defective products". International Journal of Quality & Reliability Management 38 1 (2021): 68-97. http://dx.doi.org/10.1108/ijqrm-06-2019-0185.
    Publicado • 10.1108/ijqrm-06-2019-0185
  12. Fernandes, Gabriela; Domingues, Joana; Tereso, Anabela Pereira ; Pinto, Eduardo. "A Stakeholders' Perspective on Risk Management for Collaborative University-Industry R&D Programs". Procedia Computer Science 181 (2021): 110-118. http://dx.doi.org/10.1016/j.procs.2021.01.110.
    Publicado • 10.1016/j.procs.2021.01.110
  13. Miranda, João; Tereso, Anabela Pereira ; Teixeira, José C.. "Multicriteria analysis as a better tool for the selection of public projects alternatives". Procedia Computer Science 181 (2021): 545-552. http://dx.doi.org/10.1016/j.procs.2021.01.201.
    Publicado • 10.1016/j.procs.2021.01.201
  14. Mucambe, Beatriz; Tereso, Anabela Pereira ; Faria, Joao; Mateus, Tiago. "Frameworks Ágeis de Larga-Escala: lidando com as interdependências". MundoPM Abr/Mai 98 (2021):
    Publicado
  15. Soares, João Cláudio; Sousa, Sérgio; Tereso, Anabela Pereira. "Industry practices on the rework of defective products: survey results". The TQM Journal 32 6 (2020): 1177-1196. http://dx.doi.org/10.1108/tqm-06-2019-0162.
    Publicado • 10.1108/tqm-06-2019-0162
  16. Faria, Joao; Araújo, Madalena; Demeulemeester, Erik; Tereso, Anabela Pereira. "Project management under uncertainty: using flexible resource management to exploit schedule flexibility". European Journal of Industrial Engineering 14 5 (2020): 599-631. http://dx.doi.org/10.1504/ejie.2020.109899.
    Publicado • 10.1504/ejie.2020.109899
  17. Fernandes, Gabriela; Araújo, Madalena; Andrade, Rita; Pinto, Eduardo B.; Tereso, Anabela; Machado, Ricardo J.. "Critical factors for benefits realisation in collaborative university-industry R&D programs". International Journal of Project Organisation and Management 12 1 (2020): 1. http://dx.doi.org/10.1504/ijpom.2020.105712.
    Publicado • 10.1504/ijpom.2020.105712
  18. Cruz, André; Tereso, Anabela Pereira ; Alves, Anabela. "Traditional, Agile and Lean Project Management: a systematic literature review". The Journal of Modern Project Management 24 8 (2020): 86-95. https://doi.org/10.19255/JMPM02407.
    Publicado
  19. Lima, Ricardo; Tereso, Anabela; Faria, João. "Project management under uncertainty: resource flexibility visualization in the schedule". Procedia Computer Science 164 (2019): 381-388. http://dx.doi.org/10.1016/j.procs.2019.12.197.
    Publicado • 10.1016/j.procs.2019.12.197
  20. Tereso, Anabela; Ribeiro, Pedro; Fernandes, Gabriela; Loureiro, Isabel; Ferreira, Mafalda. "Project Management Practices in Private Organizations". Project Management Journal 50 1 (2018): 6-22. http://dx.doi.org/10.1177/8756972818810966.
    Publicado • 10.1177/8756972818810966
  21. Tereso, Anabela; Ribeiro, Pedro; Cardoso, Manuel. "An Automated Framework for the Integration between EVM and Risk Management". Journal of Information Systems Engineering & Management 3 1 (2018): http://dx.doi.org/10.20897/jisem.201803.
    Publicado • 10.20897/jisem.201803
  22. Sousa, Paulo; Tereso, Anabela; Alves, Anabela; Gomes, Liliana. "Implementation of project management and lean production practices in a SME Portuguese innovation company". Procedia Computer Science 138 (2018): 867-874. http://dx.doi.org/10.1016/j.procs.2018.10.113.
    Publicado • 10.1016/j.procs.2018.10.113
  23. Catarina Oliveira; Anabela Tereso; Gabriela Fernandes. "PMO Conceptualization for Engineering and Construction Businesses". Procedia Computer Science 121 (2017): 592-599. https://doi.org/10.1016/j.procs.2017.11.078.
    Publicado • 10.1016/J.PROCS.2017.11.078
  24. Deborah Perrotta; Madalena Araújo; Gabriela Fernandes; Tereso, Anabela Pereira ; João Faria. "Towards the development of a methodology for managing industrialization projects". Procedia Computer Science (2017): https://publons.com/publon/9469785/.
    Publicado • 10.1016/J.PROCS.2017.11.113
  25. Matos, Ivo Alexandre; Alves, Anabela Carvalho; Tereso, Anabela Pereira. "Lean Principles in an Operating Room Environment". Journal of Health Management 18 2 (2016): 239-257. http://dx.doi.org/10.1177/0972063416637716.
    Publicado • 10.1177/0972063416637716
  26. Andrade, Rita; Fernandes, Gabriela; Tereso, Anabela. "Benefits Management in University-Industry R&D Collaborative Projects: A Review on Benefits and Success Factors". Procedia Computer Science 100 (2016): 921-927. http://dx.doi.org/10.1016/j.procs.2016.09.249.
    Publicado • 10.1016/j.procs.2016.09.249
  27. Peixoto, J.; Tereso, A.; Fernandes, G.; Almeida, R.. "A project risk management methodology developed for an electrical Portuguese organization". International Journal of Human Capital and Information Technology Professionals 7 1 (2016): 1-19. http://www.scopus.com/inward/record.url?eid=2-s2.0-84954430795&partnerID=MN8TOARS.
    Publicado • 10.4018/IJHCITP.2016010101
  28. Sa, Vera; Tereso, Anabela. "Implementation of Project Management Practices in the Direct Purchasing System of a Company". Vision: Innovation Management, Development Sustainability, and Competitive Economic Growth, Vols I - Vii (2016): https://publons.com/publon/9469781/.
    Publicado
  29. Mishly, Mohamad Ali; Tereso, Anabela. "Primary Roadmap Towards a Project and Portfolio Management Framework to Support Innovation-Driven SMEs". Vision: Innovation Management, Development Sustainability, and Competitive Economic Growth, Vols I - Vii (2016): https://publons.com/publon/9469782/.
    Publicado
  30. Moutinho, Rui; Tereso, Anabela. "Project Scheduling and Cost Minimization with Multiple Availability Constrained Resources under Stochastic Conditions". International Journal of Human Capital and Information Technology Professionals 6 4 (2015): 46-63. http://dx.doi.org/10.4018/ijhcitp.2015100103.
    Publicado • 10.4018/ijhcitp.2015100103
  31. Junkes, M. Bernadete; Tereso, Anabela P.; Afonso, Paulo S.L.P.. "The Importance of Risk Assessment in the Context of Investment Project Management: A Case Study". Procedia Computer Science 64 1 (2015): 902-910.
    Publicado • 10.1016/j.procs.2015.08.606
  32. Rocha, A.; Tereso, A.; Cunha, J.; Ferreira, P.. "Investments analysis and decision making: Valuing R&D project portfolios using the PROV exponential decision method". Tékhne 12 1-2 (2014): 48-59. http://dx.doi.org/10.1016/j.tekhne.2014.03.001.
    Publicado • 10.1016/j.tekhne.2014.03.001
  33. Tereso, Anabela Pereira; Guedes, André; Cascais, António Carlos Pinheiro. "A Computer Application for Scheduling in MS Project". Computer Science and Applications 1 5 (2014): 309-318. https://pdfs.semanticscholar.org/81da/ac2d09efbc7d92e7b52392d12f4282f1edd7.pdf.
    Publicado
  34. Peixoto, Joana; Tereso, Anabela; Fernandes, Gabriela; Almeida, Rui. "Project Risk Management Methodology: A Case Study of an Electric Energy Organization". Procedia Technology 16 (2014): 1096-1105. http://dx.doi.org/10.1016/j.protcy.2014.10.124.
    Publicado • 10.1016/j.protcy.2014.10.124
  35. Moutinho, Rui; Tereso, Anabela. "Scheduling of Multimodal Activities with Multiple Renewable and Availability Constrained Resources under Stochastic Conditions". Procedia Technology 16 1 (2014): 1106-1115.
    Publicado • 10.1016/J.PROTCY.2014.10.125
  36. Silva, David; Tereso, Anabela; Fernandes, Gabriela; Pinto, José Ângelo. "OPM3® Portugal Project: Analysis of Preliminary Results". Procedia Technology 16 (2014): 1027-1036. http://dx.doi.org/10.1016/j.protcy.2014.10.057.
    Publicado • 10.1016/j.protcy.2014.10.057
  37. Ferreira, Mafalda; Tereso, Anabela; Ribeiro, Pedro; Fernandes, Gabriela; Loureiro, Isabel. "Project Management Practices in Private Portuguese Organizations". Procedia Technology 9 (2013): 608-617. http://dx.doi.org/10.1016/j.protcy.2013.12.067.
    Publicado • 10.1016/j.protcy.2013.12.067
  38. Tereso, Anabela; Cardoso, João Paulo; Cabral, José Pedro. "Activity-on-arc network graphic editor". Journal of Operations and Logistics 4 2 (2012): 17-29. http://hdl.handle.net/1822/15534.
    Publicado
  39. Hussain, Deedar; Figueiredo, Manuel; Tereso, Anabela Pereira ; Ferreira, Fernando. "Strategic Planning for the Textile and Clothing Supply Chain". Lecture Notes in Engineering and Computer Science 3 (2012): 1621-1626.
    Publicado
  40. Rocha, Antonio; Tereso, Anabela Pereira ; Ferreira, Paula Varandas. "Prov Exponential Decision Method". Lecture Notes in Engineering and Computer Science 2199 1 (2012): 1574-1579. http://hdl.handle.net/1822/21156.
    Publicado
  41. Silva, Helder C.; Oliveira, José António; Tereso, Anabela Pereira. "Um Algoritmo Genético para Programação de Projectos em Redes de Actividades com Complementaridade de Recursos". RISTI - Revista Ibérica de Sistemas e Tecnologias de Informação 6 (2010): 59-72. http://www.scielo.mec.pt/pdf/rist/n6/n6a06.pdf.
    Publicado
  42. Tereso, Anabela Pereira; Novais, Rui; Araújo, Maria Madalena; Elmaghraby, S.E.. "Optimal resource allocation in stochastic activity networks via the electromagnetism approach: a platform implementation in Java". Control and Cybernetics 38 3 (2009): 745-782. https://publons.com/publon/4945878/.
    Publicado
  43. Tereso, Anabela Pereira; Mota, João Ricardo; Lameiro, Rui Jorge. "Adaptive Resource Allocation to Stochastic Multimodal Projects: A distributed platform implementation in Java". Control and Cybernetics 35 3 (2006): 661-686. http://www.scopus.com/inward/record.url?eid=2-s2.0-33947270346&partnerID=MN8TOARS.
    Publicado
  44. Tereso, Anabela Pereira ; Araújo, M.Madalena T.; Elmaghraby, Salah E.. "Adaptive resource allocation in multimodal activity networks". International Journal of Production Economics 92 1 (2004): 1-10. http://dx.doi.org/10.1016/j.ijpe.2003.09.005.
    Publicado • 10.1016/j.ijpe.2003.09.005
Capítulo de livro
  1. Fernandes, Inês Xavier; de Sá-Soares, Filipe; Tereso, Anabela Pereira. "Modelling and Analysing Product Development Processes in the Textile and Clothing Industry". In Innovations in Industrial Engineering II, 220-233. Springer International Publishing, 2023.
    Publicado • 10.1007/978-3-031-09360-9_19
  2. Lima, Orlando; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Innovation and Sustainability Practices in Project Management Within SMEs Context – A Systematic Literature Review". In Lecture Notes in Networks and Systems, 45-59. Springer International Publishing, 2022.
    Publicado • 10.1007/978-3-031-04829-6_5
  3. Ferreira, Giselle; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Project Management in Service Sector SMEs: A Comparative Study Between Portugal and Denmark". In Lecture Notes in Networks and Systems, 60-69. Springer International Publishing, 2022.
    Publicado • 10.1007/978-3-031-04829-6_6
  4. Pinto, Leandro; Pereira, Alberto; Tereso, Anabela Pereira ; Brito, Marlene. "Application of Scheduling and Capacity Management Tools in a Multi-project Environment". In Lecture Notes in Networks and Systems, 157-166. Springer International Publishing, 2022.
    Publicado • 10.1007/978-3-031-04829-6_14
  5. Barbosa, João; Fernandes, Gabriela; Tereso, Anabela Pereira. "Benefits of University-Industry R&D Collaborations: A Systematic Literature Review". In Innovations in Industrial Engineering II, 257-280. Springer International Publishing, 2022.
    Publicado • 10.1007/978-3-031-09360-9_22
  6. Watanabe, Cristiano Seiji; Tereso, Anabela Pereira ; Fernandes, Aldora Gabriela Gomes; Jespersen, Lars; Vestgaard, Jens. "Project Management Practice in SMEs: A Comparative Study of the Portuguese and Danish Economic Context". In Trends and Applications in Information Systems and Technologies, 96-105. Springer International Publishing, 2021.
    Publicado • 10.1007/978-3-030-72651-5_10
  7. Dinis, Cláudia; Ribeiro, Pedro; Tereso, Anabela Pereira. "A Project Management Hybrid Model of Software Development in an Academic Environment". In Trends and Applications in Information Systems and Technologies, 116-125. Springer International Publishing, 2021.
    Publicado • 10.1007/978-3-030-72651-5_12
  8. Fernandes, Gabriela; Domingues, Joana; Tereso, Anabela Pereira ; Pinto, Eduardo. "Critical Management Risks in Collaborative University-Industry R&D Programs". In Trends and Applications in Information Systems and Technologies, 106-115. Springer International Publishing, 2021.
    Publicado • 10.1007/978-3-030-72651-5_11
  9. Fernandes, Gabriela; Capitão, Marlene; Tereso, Anabela Pereira ; Oliveira, José; Pinto, Eduardo B.. "Stakeholder Management in University-Industry Collaboration Programs: A Case Study". In Lecture Notes in Mechanical Engineering, 134-147. Springer International Publishing, 2021.
    Publicado • 10.1007/978-3-030-78170-5_13
  10. Lima, Caio; Tereso, Anabela; Araújo, Madalena. "A Capacity Management Tool for a Portfolio of Industrialization Projects". In Trends and Innovations in Information Systems and Technologies, 74-83. Springer International Publishing, 2020.
    Publicado • 10.1007/978-3-030-45688-7_8
  11. Souza, Ingrid; Tereso, Anabela; Mesquita, Diana. "Communication in Project Management: An Action Research Approach in an Automotive Manufacturing Company". In Trends and Innovations in Information Systems and Technologies, 64-73. Springer International Publishing, 2020.
    Publicado • 10.1007/978-3-030-45688-7_7
  12. Pires, Sara; Tereso, Anabela; Fernandes, Gabriela. "Improving Project Management Practices in a Software Development Team". In Trends and Innovations in Information Systems and Technologies, 104-113. Springer International Publishing, 2020.
    Publicado • 10.1007/978-3-030-45688-7_11
  13. Meirelles, Eliane Gonzales; Tereso, Anabela Pereira ; Santos, Cláudio. "The Importance of Project Management Competences: A Case Study in Public Administration". In New Knowledge in Information Systems and Technologies, 101-111. Springer International Publishing, 2019.
    Publicado
  14. Tereso, Anabela Pereira ; Leão, Celina P.; Ribeiro, Tobias. "Project Management Practices at Portuguese Startups". In New Knowledge in Information Systems and Technologies, 39-49. Springer International Publishing, 2019.
    Publicado
  15. Fernandes, Diana; Tereso, Anabela Pereira ; Fernandes, Gabriela. "Improvement of Industrialization Projects Management: An Automotive Industry Case Study". In New Knowledge in Information Systems and Technologies, 112-121. Springer International Publishing, 2019.
    Publicado
  16. Soares, João Cláudio Ferreira; Tereso, Anabela Pereira; Sousa, Sérgio Dinis Teixeira. "Use of Analytic Hierarchy Process (AHP) to Support the Decision-Making About Destination of a Batch of Defective Products with Alternatives of Rework and Discard". In Springer Proceedings in Mathematics & Statistics, 365-391. Springer International Publishing, 2018.
    Publicado • 10.1007/978-3-319-71583-4_25
  17. Ribeiro, F.; Ferreira, A.L.; Tereso, A.; Perrotta, D.. "Development of a grooming process for an agile software team in the automotive domain". In Trends and Advances in Information Systems and Technologies. WorldCIST'18. Advances in Intelligent Systems and Computing.. 2018.
    Publicado • 10.1007/978-3-319-77703-0_86
  18. Reis, A.; Tereso, A.; Santos, C.; Coelho, J.. "Development of an interface for managing and monitoring projects in an automotive company". In Trends and Advances in Information Systems and Technologies. WorldCIST'18. Advances in Intelligent Systems and Computing.. 2018.
    Publicado • 10.1007/978-3-319-77703-0_88
  19. Almeida, A.; Tereso, A.; Faria, J.; Ruão, T.. "Knowledge sharing in industrialization project management practices". In Trends and Advances in Information Systems and Technologies. WorldCIST'18. Advances in Intelligent Systems and Computing.. 2018.
    Publicado • 10.1007/978-3-319-77703-0_5
  20. Alves, A.C.; Abreu, M.F.; Tereso, A.P.; Ferreira, P.V.. "Production system configuration selection in a lean environment using analytic hierarchy process". In Recent Advances in Information Systems and Technologies, 57-76. Nova Science Publishers, Inc., 2017.
    Publicado
  21. Sousa, C.; Tereso, A.; Fernandes, G.. "Improving project management practices in architecture & design offices". In Trends and Advances in Information Systems and Technologies. WorldCIST'18. Advances in Intelligent Systems and Computing.. 2017.
    Publicado • 10.1007/978-3-319-56538-5_6
  22. Tereso, A.; Ribeiro, P.; Cardoso, M.. "Integration between EVM and risk management: Proposal of an automated framework". In Innovations in Industrial Engineering. icieng 2021. Lecture Notes in Mechanical Engineering. 2017.
    Publicado • 10.1007/978-3-319-56538-5_4
  23. Kisly, D.; Tereso, A.; Carvalho, M.S.. "Multiple case study of the supplier selection decision process". In New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing.. 2016.
    Publicado • 10.1007/978-3-319-31232-3_92
  24. Kisly, D.; Tereso, A.; Carvalho, M.S.. "Implementation of multiple criteria decision analysis approaches in the supplier selection process: A case study". In Innovations in Industrial Engineering. icieng 2021. Lecture Notes in Mechanical Engineering. 2016.
    Publicado • 10.1007/978-3-319-31232-3_90
  25. Ferreira, João A.; Costa, Miguel; Tereso, Anabela; Oliveira, José A.. "A Multi-Criteria Decision Support System for a Routing Problem in Waste Collection". In Evolutionary Multi-Criterion Optimization, 388-402. Springer International Publishing, 2015.
    Publicado • 10.1007/978-3-319-15892-1_26
  26. Tereso, A.; Amorim, J.. "BeSmart2: A multicriteria decision aid application". In New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing.. 2015.
    Publicado • 10.1007/978-3-319-16486-1_69
  27. Silva, D.; Tereso, A.; Fernandes, G.; Loureiro, I.; Pinto, J.Â.. "OPM3® Portugal project - information systems and technologies organizations - outcome analysis". In New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing.. 2015.
    Publicado • 10.1007/978-3-319-16486-1_46
  28. Moutinho, R.; Tereso, A.. "Concurrency detection on finish-to-start activity precedence networks". In New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing.. 2015.
    Publicado • 10.1007/978-3-319-16486-1_3
  29. Rocha, L.; Tereso, A.; Couto, J.P.. "Project management: Evaluation of the problems in the portuguese construction industry". In New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing.. 2015.
    Publicado • 10.1007/978-3-319-16486-1_7
  30. Oliveira, J.; Tereso, A.; Machado, R.J.. "An application to select collaborative project management software tools". In New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing.. 2014.
    Publicado • 10.1007/978-3-319-05951-8_44
  31. Dias, M.; Tereso, A.; Braga, A.C.; Gabriela Fernandes, A.. "The key project managers' competences for different types of projects". In New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing.. 2014.
    Publicado • 10.1007/978-3-319-05951-8_34
  32. Ferreira, M.E.; Tereso, A.P.. "Software tools for project management - focus on collaborative management". In New Advances in Information Systems and Technologies. Advances in Intelligent Systems and Computing.. 2014.
    Publicado • 10.1007/978-3-319-05948-8_8
  33. Serrano, Vítor; Tereso, Anabela Pereira ; Ribeiro, Pedro; Brito, Miguel. "Standardization of Processes Applying CMMI Best Practices". In Advances in Information Systems and Technologies, 455-467. Berlin, Heidelberg: Springer Berlin Heidelberg, 2013.
    Publicado
  34. Santos, Mónica A.; Tereso, Anabela Pereira. "Multimode Resource-Constrained Project Scheduling Problem Including Multiskill Labor (MRCPSP-MS) Model and a Solution Method". In International Series in Operations Research & Management Science, 249-275. Springer US, 2013.
    Publicado • 10.1007/978-1-4614-9056-2_11
  35. Santos, Mónica A.; Tereso, Anabela P.. "On the Multi-mode, Multi-skill Resource Constrained Project Scheduling Problem - A Software Application". In Advances in Intelligent and Soft Computing, 239-248. Springer Berlin Heidelberg, 2011.
    Publicado • 10.1007/978-3-642-20505-7_21
Edição de livro
  1. Tereso, Anabela Pereira. Proceedings of the 4th International Conference on Production Economics and Project Evaluation (ICOPEV’2018). Portugal: University of Minho. 2018.
    Publicado • Editor
  2. Tereso, Anabela Pereira. Proceedings of the 3rd International Conference on Project Evaluation (ICOPEV’2016). University of Minho. 2016.
    Publicado • Editor
  3. Tereso, Anabela Pereira. Proceedings of the 2nd International Conference on Project Evaluation (ICOPEV’2014). Portugal. 2014.
    Publicado • Editor
  4. Tereso, Anabela Pereira. Proceedings of the 1st International Conference on Project Economic Evaluation (ICOPEV’2011). Guimarães, Portugal: University of Minho. 2011.
    Publicado • Editor
Livro
  1. Tereso, Anabela Pereira ; IPMA. National Competence Baseline NCB 4.0. IPMA - International Project Management Association. 2017.
    Publicado • Tradutor
Manual
  1. Tereso, Anabela Pereira. Técnicas de Decisão Multicritério. Portugal. 2009.
  2. Tereso, Anabela Pereira. Análise de Decisão. Portugal. 2007.
  3. Tereso, Anabela Pereira. Economia da Construção. Portugal. 2003.
  4. Tereso, Anabela Pereira. Gestão de Risco em Projetos. Portugal. 2003.
Resumo em conferência
  1. Tereso, Anabela Pereira ; Moura, Cacilda; Simões, Cláudia; Aguiar, Cristina; Filomena O. Soares; Mina, Isabel Aguiar Pinto; Silva, Joaquim; et al. "Os Audience Response Systems como instrumento de inovação no ensino e na aprendizagem ativa: Aplicações no âmbito de uma Comunidade de Prática e Inovação em Ensino e Aprendizagem e perceções dos alunos". Trabalho apresentado em Congresso Nacional de Práticas Pedagógicas no Ensino Superior (CNaPPES.19), Santarém, 2019.
    Publicado
  2. Azeredo, Joana; Costa e Silva, Elsa; Lino-Neto, Teresa; Ribeiro, Eugénia; Rocha, Miguel; Tereso, Anabela Pereira ; Costa, Manuel João. "A participação em comunidade de prática docente para a inovação pedagógica uma experiência de professores na implementação de TBL (Team-Based Learning)". Trabalho apresentado em Congresso Nacional de Práticas Pedagógicas no Ensino Superior (CNaPPES.19), Santarém, 2019.
    Publicado
  3. Guedes, André; Tereso, Anabela Pereira. "Scheduling with MS Project: an add-in". Trabalho apresentado em Multidisciplinary International Scheduling Conference - MISTA 2013, Ghent, 2013.
    Publicado
  4. Tereso, Anabela Pereira; Seixedo, Cristina. "Multi-Criteria Decision Aid: Evaluation and Comparison of Main Techniques/Tools". Trabalho apresentado em 24th European Conference on Operational Research, Lisboa, 2010.
    Publicado
  5. Hussain, Deedar; Figueiredo, Manuel; Tereso, Anabela Pereira; Ferreira, Fernando. "Finding Effective Strategies for Improving Textile & Clothing Supply Chain in Pakistan using SWOT Analysis & AHP". Trabalho apresentado em 24th European Conference on Operational Research, Lisboa, 2010.
    Publicado
  6. Reston Filho, José Carlos; Tereso, Anabela Pereira; Costa, Lino. "Towards the minimization of project duration and cost in stochastic project management environments". Trabalho apresentado em 24th European Conference on Operational Research, Lisboa, 2010.
    Publicado
  7. Silva, Helder; Tereso, Anabela Pereira; Oliveira, José António. "On Resource Complementarity in Activity Networks – Preliminary Results". Trabalho apresentado em 24th European Conference on Operational Research, Lisboa, 2010.
    Publicado
  8. Tereso, Anabela Pereira; Novais, Rui ; Araújo, Maria Madalena. "The Optimal Resource Allocation in Stochastic Activity Networks via the Electromagnetism Approach: a platform implementation in Java". Trabalho apresentado em 21st European Conference on Operational Research, Reykjavíc, 2006.
    Publicado
  9. Tereso, Anabela Pereira; Mota, João Ricardo; Lameiro, Rui Jorge. "Adaptive Resource Allocation Technique to Stochastic Multimodal Projects: a distributed platform implementation in JAVA". Trabalho apresentado em IFORS Triennial Conference, Honolulu–Hawaii, 2005.
    Publicado
  10. Tereso, Anabela Pereira; Araújo, Maria Madalena; Elmaghraby, Salah. "Basic Approximations to an Adaptive Resource Allocation Technique to Stochastic Multimodal Projects". Trabalho apresentado em Euro/Informs Joint International Meeting, Istanbul, 2003.
    Publicado
  11. Tereso, Anabela Pereira; Araújo, Maria Madalena; Elmaghraby, Salah. "Adaptive Resource Allocation in Multimodal Activity Networks". Trabalho apresentado em Optimization 2001, Aveiro, 2001.
    Publicado • 10.1016/j.ijpe.2003.09.005
  12. Tereso, Anabela Pereira; Machado, Altamiro; Henriques, Pedro. "Evaluation of Multimedia Tools Using Grammatical Specifications". Trabalho apresentado em 7th Mini Euro Conference, Bruges, 1997.
    Publicado
Tese / Dissertação
  1. Tereso, Anabela Pereira. "Gestão de projectos: alocação adaptativa de recursos em redes de actividades multimodais (Project management: adaptive resource allocation in multimodal activity networks)". Doutoramento, 2002. http://hdl.handle.net/1822/39.
  2. "Interfaces e Ambientes de Desenvolvimento de Aplicações Multimédia: um estudo comparativo utilizando o método de especificação gramatical (Interfaces and Development Environments for Multimedia Applications: a comparative study using the grammatical specification method)". Mestrado, Universidade do Minho, 1997.

Outros

Outra produção
  1. Aplicação Add-In com Implementação de Modelos de Escalonamento no MS Project. Software. 2012. Guedes, André; Tereso, Anabela Pereira.
  2. Aplicação para apoiar a seleção de Software de Apoio à Decisão. Software. 2011. Tereso, Anabela Pereira; Pereira, André; Portela, Bernardo; Amorim, Nuno; Pereira, Rui.
  3. Which Soft?. Software. 2011. Brandão, João; Macedo, Ricardo; Martins, Henrique; Abreu, Rafael; Tereso, Anabela Pereira.
  4. beSMART. Software. 2011. Sampaio, Ana; Costa, Miguel; Frade, Hugo; Abreu, Tiago; Tereso, Anabela Pereira.
  5. MRCPSP-MS - aplicação na área da Gestão de Projetos. Software. 2011. Santos, Mónica; Tereso, Anabela Pereira.
  6. Aplicação na área da Gestão de Projetos e da Complementaridade de Recursos. Software. 2010. Silva, Helder; Tereso, Anabela Pereira; Oliveira, José António.
  7. MCDA - aplicação na área da Análise de Decisão Multicritério. Software. 2009. Seixedo, Cristina; Tereso, Anabela Pereira.
  8. Software de Gestão de Projetos para Alocação de Recursos Considerando o Valor do Dinheiro no Tempo. Software. 2008. Barreiro, Duarte; Tereso, Anabela Pereira.
  9. AoA Manager. Software. 2008. Cardoso, João Paulo; Tereso, Anabela Pereira.
  10. Editor Gráfico de Redes de Atividades nos Arcos. Software. 2008. Cabral, José Pedro; Cardoso, João Paulo; Tereso, Anabela Pereira.
  11. Software de Gestão de Projetos para Alocação de Múltiplos Recursos. Software. 2008. Alves, Daniel; Chaves, Duarte; Cunha, Francisco; Tereso, Anabela Pereira.
  12. Software de Gestão de Projetos para Alocação de Múltiplos Recursos. Software. 2007. Moutinho, Rui; Tereso, Anabela Pereira.
  13. RANG - Random Activity Network Generator. Software. 2007. Marques, Hélder; Gonçalves, Luís; Tereso, Anabela Pereira.
  14. Software de Gestão da Alocação de Recursos a Projetos usando um Algoritmo Evolucionário. Software. 2005. Novais, Rui ; Tereso, Anabela Pereira.
  15. Software para Alocação Adaptativa de Recursos (implementado numa plataforma distribuída). Software. 2005. Mota, João Ricardo; Lameiro, Rui Jorge; Tereso, Anabela Pereira.
  16. Software de Gestão de Projetos: Alocação Adaptativa de Recursos em Redes de Atividades Multimodais. Software. 2004. Fernandes, Carlos; Capela, Cedric; Gonçalves, Filipe; Matos, Paulo; Tereso, Anabela Pereira.
  17. Alocação Adaptativa de Recursos em Redes de Atividades Multimodais. Software. 2002. Tereso, Anabela Pereira.
Atividades

Apresentação oral de trabalho

Título da apresentação Nome do evento
Anfitrião (Local do evento)
2023 Project Management in Portugal: results of the 2022 pilot study by the Portuguese Project Management Observatory CISTI'2023 - 18ª Conferência Ibérica de Sistemas e Tecnologias de Informação (CISTI2023)
(Aveiro, Portugal)
2023 Stakeholder Management and Communication Management in Non-Governmental Organizations: a systematic literature review ProjMAN 2023 - International Conference on Project MANagement 2023
(Porto, Portugal)
2022 Modelling and Analysing Product Development Processes in the Textile and Clothing Industry ICIE 2022 (International Conference Innovation in Engineer 2022)
(Guimarães, Portugal)
2021 A Project Management Hybrid Model of Software Development in an Academic Environment WorldCist'21 - 9th World Conference on Information Systems and Technologies
(Terceira Island - Azores, Portugal)
2021 Project management practice in SMEs: A comparative study of the Portuguese and Danish economic context WorldCist'21 - 9th World Conference on Information Systems and Technologies
(Terceira Island - Azores, Portugal)
2021 Critical Management Risks in Collaborative University-Industry R&D Programs WorldCist'21 - 9th World Conference on Information Systems and Technologies
(Terceira Island - Azores, Portugal)
2021 Stakeholder Management in University-Industry Collaboration Programs: A Case Study International Conference Innovation in Engineering 2021 (ICIE2021)
(Guimarães, Portugal)
2021 Differences between managing traditional projects and innovation projects 38th IBIMA Conference
(Seville, Espanha)
2021 A Capacity Management Tool for Industrialization Projects 38th IBIMA Conference
(Seville, Espanha)
2021 Stakeholder Management in University-Industry Collaboration Programs: A Case Study International Conference Innovation in Engineering 2021 (ICIE2021)
(Guimarães, Portugal)
2020 Improving Project Management Practices in a Software Development Team WorldCIST 2020 - 8th World Conference on Information Systems and Technologies
(Budva, Montenegro)
2020 Innoframe: a project and portfolio management multilayer framework to support innovation-driven SMEs 4th International Conference on Quality Engineering and Management
University of Minho (Guimarães, Portugal)
2020 Project Risk Management in an Automotive Company 4th International Conference on Quality Engineering and Management
University of Minho (Guimarães, Portugal)
2020 Multicriteria analysis as a better tool for the selection of public projects alternatives ProjMAN 2020 - International Conference on Project MANagement 2020
(Vilamoura - Algarve, Portugal)
2019 Improvement of Industrialization Projects Management: An Automotive Industry Case Study WorldCIST’19 - 7th World Conference on Information Systems and Technologies
(La Toja Island, Galicia, Espanha)
2019 Project management under uncertainty: resource flexibility visualization in the schedule ProjMAN 2019 - International Conference on Project MANagement 2019
(Sousse, Tunísia)
2019 The Importance of Project Management Competences: A Case Study in Public Administration WorldCIST’19 - 7th World Conference on Information Systems and Technologies
(La Toja Island, Galicia, Espanha)
2018 Development of an interface for managing and monitoring projects in an automotive company WorldCIST’18 - 6th World Conference on Information Systems and Technologies
(Napoli, Itália)
2018 Stakeholder Management in Industrialization Projects: an automotive industry case study ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation
(Guimarães, Portugal)
2018 Ten Leadership Factors Interconnection Power Towards Project Success in SMEs ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation
(Guimarães, Portugal)
2018 Improving Risk Management Practice in Industrialization Projects: case study of an automotive company ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation
(Guimarães)
2018 Knowledge Sharing in Industrialization Project Management Practices WorldCIST’18 - 6th World Conference on Information Systems and Technologies
(Napoli, Itália)
2017 Improving Project Management Practices in Architecture & Design Offices WorldCist'17 - 5th World Conference on Information Systems and Technologies
(Porto Santo Island, Madeira, Portugal)
2017 Use of Analytic Hierarchy Process (AHP) to Support the Decision-Making about Destination of a Batch of Defective Products with Alternatives of Rework and Discard IO2017 - XVIII Congresso da Associação Portuguesa de Investigação Operacional
(Valença, Portugal)
2017 Improving Project Management Practice: An Engineering and Construction Case Study IEEM2017 - IEEE International Conference on Industrial Engineering and Engineering Management 2017
(Singapura)
2017 Project Change Request: a Proposal for Managing Change in Industrialization Projects IEEM2017 - IEEE International Conference on Industrial Engineering and Engineering Management 2017
(Singapura)
2017 Integration Between EVM and Risk Management: Proposal of an Automated Framework WorldCist'17 - 5th World Conference on Information Systems and Technologies
(Porto Santo Island, Madeira, Portugal)
2016 Multiple case study of the supplier selection decision process WorldCIST'16 – 4th World Conference on Information Systems and Technologies
(Recife, Brasil)
2016 Project Management Under Uncertainty: Solution methods revisited ICOPEV 2016 - 3rd International Conference on Project Evaluation
(Guimarães, Portugal)
2016 Implementation of multiple criteria decision analysis approaches in the supplier selection process: a case study WorldCIST'16 – 4th World Conference on Information Systems and Technologies
(Recife, Brasil)
2015 BeSmart2: A multicriteria decision aid application WorldCIST'15 - 3rd World Conference on Information Systems and Technologies
(São Miguel, Azores, Portugal)
2015 Project Management: Evaluation of the problems in the Portuguese construction industry WorldCIST'15 - 3rd World Conference on Information Systems and Technologies
(Ponta Delgada, São Miguel, Azores, Portugal)
2015 OPM3® Portugal Project – Information Systems and Technologies Organizations – Outcome Analysis WorldCIST'15 - 3rd World Conference on Information Systems and Technologies
(Ponta Delgada, São Miguel, Azores, Portugal)
2015 Concurrency Detection on Finish-to-Start Activity Precedence Networks WorldCIST'15 - 3rd World Conference on Information Systems and Technologies
(Ponta Delgada, São Miguel, Azores, Portugal)
2014 Project Risk Management Methodology: A Case Study of an Electric Energy Organization ProjMAN 2014 - International Conference on Project MANagement
(Troia, Portugal)
2014 Scheduling of Multimodal Activities with Multiple Renewable and Availability Constrained Resources under Stochastic Conditions ProjMAN 2014 - International Conference on Project MANagement
(Troia, Portugal)
2013 Scheduling with MS Project: an add-in MISTA 2013 - 6th Multidisciplinary International Conference on Scheduling: Theory and Applications
(Ghent, Bélgica)
2012 PROV Exponential decision method 2012 International Conference of Manufacturing Engineering and Engineering Management (ICMEEM 2012) under the World Congress on Engineering (WCE 2012)
(London)
2011 On The Multi-Mode, Multi-Skill Resource Constrained Project Scheduling Problem – Computational Results 1st International Conference on Project Economic Evaluation (ICOPEV’2011)
(Guimarães)
2011 beSMART: a software tool to support the selection of decision software International Conference on Engineering UBI2011 (ICEUBI2011)
(Covilhã)
2010 On The Optimal Resource Allocation in Projects Considering the Time Value of Money Third International Conference on Information Systems, Logistics and Supply Chain (ILS 2010)
(Casablanca)
2010 On Resource Complementarity in Activity Networks Third International Conference on Information Systems, Logistics and Supply Chain (ILS 2010)
(Casablanca)
2010 Multi-Criteria Decision Aid: Evaluation and Comparison of Main Techniques/Tools 24th European Conference on Operational Research (EURO XXIV)
(Lisbon)
2010 On Resource Complementarity in Activity Networks – Further Results 2nd International Conference on Engineering Optimization (EngOpt2010)
(Lisbon)
2009 Duration Oriented Resource Allocation Strategy on Multiple Resources Projects under Stochastic Conditions International Conference on Industrial Engineering and Systems Management (IESM’ 2009)
(Montreal)
2009 Activity on Arc Network Graphic Editor International Conference on Industrial Engineering and Systems Management (IESM’ 2009)
(Montreal)
2009 Quantity Oriented Resource Allocation Strategy on Multiple Resources Projects under Stochastic Conditions International Conference on Industrial Engineering and Systems Management (IESM’ 2009)
(Montreal, Canadá)
2008 Project Management: multiple resources allocation International Conference on Engineering Optimization (EngOpt2008)
(Rio de Janeiro)
2008 Utilização de ferramentas informáticas na gestão de projetos 5º Congresso Luso-Moçambicano de Engenharia / 2º Congresso Moçambicano de Engenharia (CLME´2008/IICEM)
(Maputo)
2007 The Optimal Resource Allocation in Stochastic Activity Networks via the Evolutionary Approach: a platform implementation in Java International Conference on Industrial Engineering and Systems Management (IESM’ 2007)
(Beijing)
2006 The Optimal Resource Allocation in Stochastic Activity Networks via the Electromagnetism Approach: a platform implementation in Java 21st European Conference on Operational Research (EURO XXI)
(Reykjavíc)
2005 Adaptive Resource Allocation Technique to Stochastic Multimodal Projects: a distributed platform implementation in JAVA IFORS Triennial Conference (IFORS’05)
(Honolulu–Hawaii)
2004 The Optimal Resource Allocation in Stochastic Activity Networks via the Electromagnetism Approach Ninth International Workshop on Project Management and Scheduling (PMS’04)
(Nancy)
2003 Experimental Results of an Adaptive Resource Allocation Technique to Stochastic Multimodal Projects International Conference on Industrial Engineering and Production Management (IEPM'03)
(Porto)
2003 Basic Approximations to an Adaptive Resource Allocation Technique to Stochastic Multimodal Projects Euro/Informs Joint International Meeting
(Istanbul)
2001 Adaptive Resource Allocation in Multimodal Activity Networks Optimization 2001
(Aveiro)
1997 Evaluation of Multimedia Tools Using Grammatical Specifications 7th Mini Euro Conference
(Bruge, Bélgica)

Orientação

Título / Tema
Papel desempenhado
Curso (Tipo)
Instituição / Organização
2022 - Atual Innov4PM: a multilayer framework to support Innovation in Project Management (Innov4PM: uma framework multicamadas para apoiar a inovação na gestão de projetos)
Orientador de Cristiano Seiji Watanabe
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2022 - Atual Hibrid Project Management: challenges and approaches (Gestão de projetos híbridos: desafios e abordagens)
Orientador de Marco Esteves
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho, Portugal
2021 - Atual Scheduling multiple projects - problems and solutions (Escalonamento de múltiplos projetos - problemas e soluções)
Orientador de Renan Zocca
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2020 - Atual Organization and Management Model for the Portuguese Observatory of Project Management (Modelo de Organização e Gestão para o Observatório Português de Gestão de Projetos)
Orientador de Paulo Sousa
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2020 - Atual Multi-Project Scheduling Under Uncertainty: an approach to exploit resource flexibility
Orientador de Marzieh Aghileh
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2018 - Atual The use of artificial neural networks to improve predictability in infrastructure construction megaprojects (A utilização de redes neuronais artificiais para a melhoria da previsibilidade em megaprojetos de construção de infraestrutura)
Orientador de Alexandre Augusto de Castro Meirelles
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2017 - Atual Project Management Under Uncertainty: the influence of resource flexibility on the schedule (Gestão de Projetos Sob Incerteza: a influência da flexibilidade dos recursos no cronograma)
Orientador de Ricardo Rodrigues Dias de Lima
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2015 - Atual Applying Project Management Practices in Higher Education (Aplicação de Práticas de Gestão de Projetos no Ensino Superior)
Orientador de Roberto Prazeres
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2014 - Atual Methodology for the Development of Project Management Competencies in the Brazilian Public Administration (Metodologia para o Desenvolvimento de Competências de Gerenciamento de Projetos na Administração Pública Brasileira)
Orientador de Eliane Gonzales Meireles
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2023/01/25 - 2024/03/07 Integrating Innovation Management and Project Management in University-Industry R&D Collaborations (Integração da Gestão da Inovação e da Gestão de Projetos em Colaborações I&D Universidade-Indústria)
Orientador de Maria Helena Barros Araújo
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2023/01/24 - 2024/03/07 Stakeholder and Communication Management at the Portuguese Project Management Observatory (Gestão de Stakeholders e da Comunicação no Observatório Português Gestão de Projetos)
Orientador de Ana Rita Faria Gomes
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2023/01/17 - 2024/03/07 Governance Models for Collaborative Project Management: a case study (Modelos de Governação para Gestão de Projetos Colaborativos: um estudo de caso)
Orientador de Francisca Moreira Silva
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2022/11/22 - 2023/12/21 Development of the Governance Model for the Portuguese Project Management Observatory (Desenvolvimento do Modelo de Governação do Observatório Português de Gestão de Projetos)
Coorientador de Inês de Mesquita Ramalho de Castro Fernandes
Master in Information Systems (Mestrado em Sistemas de Informação) (Mestrado)
Universidade do Minho, Portugal
2023/01/17 - 2023/12/20 Integrating Sustainability using the Green Software Framework into Information Systems Project Management: the case of a technology consultancy in Portugal (Integração da Sustentabilidade com recurso à Framework Green Software na Gestão de Projetos de Sistemas de Informação: caso de uma consultora tecnológica em Portugal)
Orientador de Ana Cláudia da Silva Pereira
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
2022/11/10 - 2023/12/19 Defining and Improving the Processes of the Portuguese Project Management Observatory (Definição e Melhoria dos Processos do Observatório Português de Gestão de Projetos)
Coorientador de Tiago Daniel Duarte Fernandes
Master in Information Systems Engineering and Management (Mestrado em Engenharia e Gestão de Sistemas de Informação) (Mestrado)
Universidade do Minho, Portugal
2023/03/25 - 2023/11/22 Improving the cost and resource management process in industrialization projects
Orientador de Pedro Miguel Cruz Veloso
Master in Industrial Engineering and Management (Mestrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2022/03/29 - 2023/11/15 Improving Risk Management Knowledge in an Automotive Company
Orientador de Maria Inês Costa Alves Coelho
Master in Industrial Engineering and Management (Mestrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2023/03/29 - 2023/10/12 Proposal to improve project management and project risk management in product development projects in an automotive company
Orientador de Inês Laranjeiro Poças Falcão Fernandes
Master in Industrial Engineering and Management (Mestrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2023/01/13 - 2023/10/04 Resource allocation model to support ANI's financial incentives management unit (Modelo de afetação de recursos para apoio à unidade de gestão de incentivos financeiros da ANI)
Coorientador de Rita Filipa Cândido Guerreiro
Master in Industrial Engineering and Management (Mestrado em Engenharia e Gestão Industrial) (Mestrado)
Instituto Politécnico do Porto Instituto Superior de Engenharia do Porto, Portugal
2023/03/23 - 2023/09/27 Improving change management in large engineering projects: a case study
Orientador de João Carlos Ferreira Santos
Master in Industrial Engineering and Management (Mestrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2022/01/12 - 2023/03/17 Study on the State of Project Management in Portugal as part of the Portuguese Project Management Observatory (Estudo sobre o Estado da Gestão de Projetos em Portugal no âmbito do Observatório Português de Gestão de Projetos)
Orientador de Rui Jorge Alves Mendes
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2021/01/19 - 2022/12/16 Benefits of University-Industry Collaborations: a systematic literature review (Benefícios das Colaborações Universidade-Indústria: revisão sistemática da literatura)
Orientador de João José Oliveira Barbosa
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2022/01/26 - 2022/12/12 Comparative study between the PM² and PRiSM methodologies (Estudo comparativo entre as metodologias PM² e PRiSM)
Orientador de Patrícia Marlene Machado Marques
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2022/01/15 - 2022/12/12 Improving the industrialization process of platform product development projects for assisted autonomous driving (Melhoria do processo de industrialização de projetos de desenvolvimento de produtos plataforma para condução autónoma assistida)
Coorientador de Ana Isabel Afonso Vaqueiro
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2022/01/12 - 2022/11/25 Application of the PM² Program Management methodology in the Management of the Development Program of the Portuguese Project Management Observatory (Aplicação da metodologia PM² Programme Management na Gestão do Programa de Desenvolvimento do Observatório Português de Gestão de Projetos)
Orientador de Vânia Soraia Cerqueira Novo
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2022/02/02 - 2022/11/17 Implementing agile project management methodologies on a Minimum Viable Product development
Orientador de Danna Beatriz Rodrigues Dias
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2022/01/11 - 2022/11/17 Application of the PM² methodology in the management of a store design project in an organization in the building materials sales sector (Aplicação da metodologia PM² na gestão do projeto de conceção de uma loja numa organização do setor da venda de materiais de construção)
Orientador de Ricardo da Silva Guimarães
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2021/01/13 - 2022/07/28 Study on the State of Project Management in Portugal as part of the Portuguese Project Management Observatory (Estudo sobre o Estado da Gestão de Projetos em Portugal no âmbito do Observatório Português de Gestão de Projetos)
Orientador de Catarina Isabel Lemos Miranda
Master's in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2021/01/16 - 2022/07/01 Application of the PM² Methodology in the Management of the Project to Create the Portuguese Project Management Observatory (Aplicação da Metodologia PM² na Gestão do Projeto de Criação do Observatório Português de Gestão de Projeto)
Orientador de Ângela Sofia Ribeiro Lopes
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2021/01/09 - 2022/03/11 Proposals for Improving the Product Development Process in the Textile and Clothing Industry (Propostas de Melhoria no Processo de Desenvolvimento de Produto na Indústria Têxtil e Vestuário)
Orientador de Inês Sofia Xavier Fernandes
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2021/01/15 - 2022/02/04 Implementation of good engineering practices based on a maturity model in agile development contexts
Orientador de Carolina Lomar da Costa Gonçalves
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2021/01/19 - 2022/02/02 Ratio Project Planning: product cost optimization projects in the production phase
Coorientador de Diogo André Ferreira de Sá Machado
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2021/01/19 - 2022/02/02 Improving visibility in large engineering projects: a case study
Orientador
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2021/01/09 - 2021/12/22 Website Development Project for the Portuguese Project Management Observatory (Projeto de Desenvolvimento do Website do Observatório Português de Gestão de Projetos)
Orientador de Eduardo Ribeiro de Abreu
Master in Engineering Project Management (Mestrado em Gestão de Projetos em Engenharia) (Mestrado)
Universidade do Minho, Portugal
2021/01/16 - 2021/11/22 Practices and Benefits of Innovation and Sustainability in Project Management within SMEs Context
Orientador de Orlando de Sousa Lima Júnior
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2020/01/28 - 2021/09/22 How SMEs Effectively Use Project Management for Business Development: a comparison of Portugal and Denmark service sector
Orientador de Giselle Mendes Ferreira
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2019/09/13 - 2021/09/21 Differences between managing traditional projects and innovation projects
Orientador de Frederico Mammarella Araújo
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2020/01/08 - 2021/07/30 Stakeholder Management in R&D Programs and Projects in University-Industry Collaboration (Gestão de Stakeholders em Programas e Projetos de I&D em Colaboração Universidade-Indústria)
Orientador de Marlene Cachada Capitão
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2020/12/01 - 2021/06/18 Improvement of Project Lines Coordination: a case study of automotive R&D innovation
Orientador de Renato Teixeira Araújo de Matos Pinto
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2020/01/28 - 2021/05/17 Project management for business development: a comparison of Portugal and Denmark industry sector
Orientador de Cristiano Seiji Watanabe
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2020/01/01 - 2021/01/12 Definition and Follow-up of the Development of an Interactive Platform to Support Project Management Practices in Small and Medium Enterprises (Definição e Acompanhamento do Desenvolvimento de uma Plataforma Interativa de Apoio às Práticas de Gestão de Projetos nas Pequenas e Médias Empresas)
Coorientador de Cláudia Alves Dinis
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2019/10/21 - 2020/11/02 Study and Improvement of Project Risk Management Practices in an Automotive Industry Company (Estudo e Melhoria das Práticas de Gestão do Risco em Projetos numa Empresa da Indústria Automóvel)
Orientador de Marta Henriques Gonça
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2019/05/11 - 2020/11/02 Risk Management in R&D Programs and Projects in University-Industry Collaboration: A Stakeholder Perspective (Gestão de Riscos em Programas e Projetos de I&D em Colaboração Universidade-Indústria: uma perspetiva de stakeholders)
Orientador de Joana Ferreira Domingues
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2019 - 2019 Study of the application of agile practices for large-scale projects in an automotive company (Estudo da aplicação de práticas ágeis de projetos de larga escala numa empresa do sector automóvel)
Orientador de Beatriz Jorge Seabra Mucambe
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2019 - 2019 Improvement proposal of a project management process in a construction company (Proposta de melhoria de processos de gestão de projetos numa empresa de construção)
Orientador de Saulo Baldin Montanheiro
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2019 - 2019 Process improvement through a Lean Office approach and agile methodologies in the logistics planning department of an electronic components company (Melhoria de processos através de uma abordagem Lean Office e metodologias ágeis no departamento de planeamento logístico de uma empresa de componentes eletrónicos)
Coorientador de Jardel Santos de Oliveira
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2019 - 2019 Development of a tool for capability management in industrialization projects: case study in the automotive industry (Desenvolvimento de uma ferramenta para gestão de capacidades em projetos de industrialização: estudo de caso na indústria automóvel)
Orientador de Caio Furtado Lima
Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado)
Universidade do Minho, Portugal
2019 - 2019 Communication in Project Management: definition, analysis and improvements in an automotive manufacturing company
Orientador de Ingrid Teixeira de Souza
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Proposal of a new project management process of in a logistics department of an automotive company, applying lean thinking principles (Proposta de um novo processo de gestão de projetos num departamento de logística de uma empresa do ramo automotivo, aplicando princípios do pensamento lean)
Orientador de André Miguel Rua Cruz
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 New Product Development Project in an Industrial Sewing Thread Company (Projeto de Desenvolvimento de Novos Produtos numa Empresa de Linhas de Costura Industriais)
Orientador de Adriana Patrícia Oliveira Fernandes
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Improvement of project management processes and practices by risk management, project management software and lean tools in a metalworking company
Orientador de Felipe Rodrigues Saldanha
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Implementation of a Project Management System in an SME (Implementação de um Sistema de Gestão de Projetos numa PME)
Orientador de Pedro José Miranda Raposo Alves
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Proposal of a new framework for project management in a logistics department of an automotive company, applying Lean Thinking principles
Orientador de André Miguel Rua Cruz
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Project Management Practices: case study of a public entity in a developing country (Práticas de Gestão de Projetos: estudo de caso de uma entidade pública de um país em desenvolvimento)
Coorientador de Natanael Fernandes Sá Nogueira Ferreira
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Risk Management in Industrial Projects (A Gestão do Risco em Projetos Industriais)
Orientador de Elisabete dos Anjos Varanda de Oliveira
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Improvement of performance indicators after Scrum re-implementation in software development teams
Orientador de Maria José Barros Araújo
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Applying Agile Project Management Methodologies at PROEF Group's Innovation Department (Aplicação de Metodologias Ágeis de Gestão de Projetos no Departamento de Inovação do Grupo PROEF)
Coorientador de Paulo Ricardo Fernandes Gonçalves
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Analysis of project management approaches applicable to the textile and apparel industry (Análise de abordagens de gestão de projetos aplicáveis à indústria têxtil e de vestuário)
Orientador de Brenda Faria Monteiro Silva
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2019 Improving Risk Management Practices in Industrialization Projects: Case Study in the Automotive Industry (Melhoria das Práticas de Gestão do Risco em Projetos de Industrialização: Caso de Estudo no Setor da Indústria Automóvel)
Coorientador de Bruno Miguel Alves Rodrigues
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2017 - 2019 Improving project management practices in a software development team (Melhoria das práticas de gestão de projetos numa equipa de desenvolvimento de software)
Orientador de Sara Patrícia Guerra Pires
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2017 - 2019 Study of the functions and responsibilities of a project management office to support university research centers
Coorientador de Hugo Daniel Cortês de Sousa
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2019 Decision support model for reworking defective products (Modelo de apoio à tomada de decisão quanto ao retrabalho de produtos defeituosos)
Coorientador de João Cláudio Ferreira Soares
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2015 - 2019 Project and Portfolio Management: A Multilayer Framework to Support Innovation-Driven SMEs in the Industry of Construction and Building Materials. Case of Canada
Orientador de Mohamad Ali Mishly
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2015 - 2019 Linking Leadership to Project Success in IT Projects in the SMEs' Manufacturing Industry. Case of Canada
Orientador de Lina Alshelh
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2018 Capability Management in Industrialization Projects: case study in the automotive industry (Gestão de Capacidades em Projetos de Industrialização: caso de estudo na indústria automóvel)
Orientador de Maria José da Silva Pereira
Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado)
Universidade do Minho, Portugal
2018 - 2018 Improving the process of industrialization project management: case study in the automotive industry (Melhoria do processo de gestão de projetos de industrialização: caso de estudo na indústria automóvel)
Orientador de Diana Marisa Macedo Fernandes
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2018 Project management practices in Portuguese startups (Práticas de gestão de projectos em startups portuguesas)
Orientador de Tobias Martins Rieiro
Master in Industrial Engineering (Mestrado em Engenharia Industrial)
Universidade do Minho - Campus de Azurém, Portugal
2017 - 2018 Implementation of work management for a Product Data Management team in an automotive company (Implementação de gestão de trabalho para uma equipa de Produt Data Management numa empresa do ramo automóvel)
Orientador de João Pedro Costa Alves Coelho
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2017 - 2018 Project management applied to task transfer projects for shared service centers: focus on planning and control processes (A gestão de projetos aplicada a projetos de transferência de tarefas para centros de serviços partilhados: foco em processos de planeamento e controlo)
Orientador de Joana Isabel Pinheiro Ribeiro
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2017 - 2018 The Value Framework of Project Management in University-Industry R&D Collaborations
Orientador de Carla Maria Oliveira de Sousa
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2017 - 2017 Study and implementation of Project Management techniques in Preh Portugal's Industrialization Projects (Estudo e implementação de técnicas de Gestão de Projetos nos Projetos de Industrialização da Preh Portugal)
Orientador de Joana Raquel Salazar Brito Pinto de Almeida
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2017 - 2017 Customization of Industrialization Project Management Practices: developing a workbook
Orientador de Ana Isabel dos Reis Almeida
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2017 Development of a grooming process for an agile software team in the automotive domain
Orientador de Francisca de Sousa Ribeiro
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2017 Development of an interface for managing and monitoring projects in an automotive company
Orientador de Andreia Carina Sousa Reis
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2016 - 2017 Improvement on the project elaboration's processes using Lean tools in an electronic components company
Orientador de Ana Sofia Alves dos Reis
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2017 Improving project management practices in a metallurgical company (Melhoria das práticas de gestão de projetos numa empresa metalúrgica)
Orientador de Irene Covas da Costa
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2017 Conceptualization of a Project Management Office (PMO) in an Engineering and Construction Company (Conceptualização de um Project Management Office (PMO) numa Empresa de Engenharia e Construção)
Orientador de Catarina da Silva Oliveira
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2017 Stakeholder Management in Industrialization Projects: case study from the automotive industry (Gestão de Stakeholders em Projetos de Industrialização: caso de estudo da indústria automóvel)
Orientador de Hugo José Fernandes Carvalho
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2017 Improving Project Management Practices: Case Study in the Engineering and Construction Sector (Melhoria das Práticas de Gestão de Projetos: Caso de Estudo no Setor de Engenharia e Construção)
Orientador de Sofia Reimão Queiroga Valério de Carvalho
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2017 Evaluation and Selection of Public Projects: General Methodology and Application of Multicriteria Analysis (Avaliação e Seleção de Projetos Públicos: Metodologia Geral e Aplicação de Análise Multicritério)
Coorientador de João Luís Lima Pinho de Miranda
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2017 Integration between EVM and Risk Management: proposal of an automated framework (Integração entre o EVM e a Gestão de Risco: proposta de um framework automatizado)
Coorientador de Manuel António Pereira Cardoso
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2015 - 2017 Warehouse facilities transfer project: the WEGEuro case (Projeto de transferência de instalações de armazéns: o caso da WEGEuro)
Coorientador de Sandra Raquel Ferreira de Sousa
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2015 - 2016 Conceptualization of PMO structures in Research centers (Conceptualização de estruturas PMO em centros de investigação)
Orientador de Helena Isabel Carvalho Ferreira
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2015 - 2016 Benefits management in University-Industry collaborative R&DT project programs (Gestão de benefícios em programas de projetos de I&DT em colaboração Universidade-Indústria)
Orientador de Rita de Andrade Brites Pereira
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2015 - 2016 Study and improvement of project management practices in small Architecture and Design firms (Estudo e melhoria das práticas de gestão de projetos em pequenos gabinetes de Arquitetura e Design)
Orientador de Cátia Marlene Ribeiro de Sousa
Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2015 - 2016 Application of multiple criteria decision analysis for supplier evaluation and selection
Coorientador de Dmitry Kisly
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2015 - 2016 Implementing Project Management Practices in a Company's Direct Purchasing System (Implementação de Práticas de Gestão de Projetos no Sistema de Compras Diretas de uma Empresa)
Orientador de Vera Daniela Cunha de Sá
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2014 - 2016 Assessment and Management of Public Lighting Energy Efficiency Projects (Avaliação e Gestão de Projetos de Eficiência Energética da Iluminação Pública)
Orientador de Tiago Miguel Alves Ribeiro
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2014 - 2015 Development and implementation of a model to support the selection of financing modalities for a given investment (Desenvolvimento e implementação de um modelo de apoio à seleção de modalidades de financiamento para um dado investimento)
Orientador de Carlos Tiago Azevedo da Silva
Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado)
Universidade do Minho, Portugal
2014 - 2014 Development of a Multicriteria Decision Support Tool (Desenvolvimento de uma ferramenta de apoio à decisão multicritério)
Orientador de João Miguel Ramos da Costa Amorim
Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado)
Universidade do Minho, Portugal
2014 - 2014 OPM3 Portugal Project - Sectoral analysis of results applied to the investigation of organizational maturity in Project Management (Projeto OPM3 Portugal - Análise setorial de resultados aplicado à investigação da maturidade organizacional em Gestão de Projetos)
Orientador de David Renato Macedo Alves da Silva
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2014 - 2014 Risk management of the Batalha Distribution Automation Pilot Project at EDP Distribuição (Gestão do risco do Projeto Piloto Distribution Automation da Batalha na EDP Distribuição)
Orientador de Joana Filipa Gonçalves Peixoto
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2012 - 2014 Project Management - Assessment of problems in the Portuguese construction industry (Gestão de Projectos - Avaliação dos problemas na indústria de construção Portuguesa)
Orientador de Leonel Fernandes da Rocha
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2009 - 2014 Total cost optimization of projects involving activities with multiple availability-constrained resources in a stochastic context (Otimização do custo total de projetos envolvendo atividades com múltiplos recursos restritos em disponibilidade, num contexto estocástico)
Orientador de Rui Filipe Soares Moutinho
Master in Computer Science (Mestrado em Informática) (Mestrado)
Universidade do Minho, Portugal
2013/03/23 - 2013/12/04 Use of IT Tools in Project Management - Focus on Collaborative Management (Utilização de Ferramentas Informáticas na Gestão de Projetos - Enfoque na Gestão Colaborativa)
Orientador de Juliana Filipa Rodrigues Oliveira
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2013/03/01 - 2013/12/04 The competencies of project managers in different types of projects (As competências dos gestores de projetos nos diferentes tipos de projetos)
Orientador de Margarida Maria Pereira Rodrigues Dias
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2013 - 2013 Project Management Practices in Portuguese Private Organizations (Práticas de Gestão de Projetos em Organizações Privadas Portuguesas)
Orientador de Mafalda Sofia Antunes Ferreira
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2013 - 2013 Storage and stock management in the footwear industry (Armazenagem e gestão de stocks na indústria do calçado)
Coorientador de Élia Marina Pereira Caravalho
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2012 - 2013 Risk Assessment in Investment Projects in the Amazon Region - Brazil (Avaliação de Riscos em Projetos de Investimento na Região Amazônica - Brasil)
Orientador de Bernadete Junkes
Post-Doctorate in Production and Systems (Pós-doutoramento em Produção e Sistemas) (Outra)
Universidade do Minho, Portugal
2012 - 2013 The use of software tools for project management - focus on collaborative management
Orientador de Maria Ester Pereira Ferreira
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2011 - 2013 Applying decision models to manage raw material costs (Aplicação de modelos de decisão na gestão dos custos com matéria-prima)
Coorientador de Eduardo Roberto Martins Ribeiro
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2009 - 2013 Resource Complementarity Analysis: Relevance for Activity Networks (Análise da Complementaridade de Recursos: Relevância para Redes de Atividades)
Orientador de Helder Cruz da Silva
Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento)
Universidade do Minho, Portugal
2012 - 2012 Process standardization applying CMMI best practices (Standarização de processos aplicando as melhores práticas do CMMI)
Orientador de Vítor Manuel Lopes Serrano
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal
2012 - 2012 Implementing project scheduling models in MS Project using VBA (Implementação de modelos de escalonamento de projectos no MS Project usando VBA)
Orientador de André Filipe Macedo Guedes
Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado)
Universidade do Minho, Portugal
2012 - 2012 Supply Chain in a Apparel Production Company (Supply Chain numa Empresa de Produção de Vestuário)
Coorientador de Jorge Mateus Moreira Simões
Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado)
Universidade do Minho, Portugal
2008 - 2011 Project Management - scheduling problem in multi-level projects (Gestão de Projectos - problema do escalonamento em projectos multi-nível)
Orientador de Mónica de La Salete Assunção Santos
Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado)
Universidade do Minho, Portugal
2009 - 2009 Multicriteria Decision Analysis: evaluation and comparison of the main techniques/tools (Análise de Decisão Multicritério: avaliação e comparação das principais técnicas/ferramentas)
Orientador de Cristina Daniela Perdigão Seixedo
Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado)
Universidade do Minho, Portugal
2004 - 2006 Integrated Performance Evaluation System (Sistema Integrado de Avaliação de Desempenho)
Coorientador de Marco Aurélio Pires Carrilho Vicente
Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado)
Universidade do Minho, Portugal

Organização de evento

Nome do evento
Tipo de evento (Tipo de participação)
Instituição / Organização
2023/09/01 - 2024/01/12 Project Management Workshop 2024 (Workshop de Gestão de Projetos 2024) (2024/01/12)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2022/09/01 - 2023/01/20 Project Management Workshop 2023 (Workshop de Gestão de Projetos 2023) (2023/01/20)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2022/02/24 - 2022/09/22 PM Symposium Lisbon 2022: Sustentabilidade em Gestão de Projetos (Sustainability in Project Management) - Project Management SUMMIT Lisbon 2022 (PMI) (2022/09/22 - 2022/09/22)
Simpósio (Membro da Comissão Organizadora)
PMI Portugal, Portugal
2021/09/01 - 2022/01/28 Project Management Workshop 2022 (Workshop de Gestão de Projetos 2022) (2022/01/28 - 2022/01/28)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2020/09/01 - 2021/01/29 Project Management Workshop 2021 (Workshop de Gestão de Projetos 2021) (2021/01/29 - 2021/01/29)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho, Portugal
2019/01/15 - 2021/01/28 Program TOP - Together On Projects (Programa TOP - Together On Projects) (2019/03/20 - 2021/01/28)
Oficina (workshop) (Coorganizador)
Partnership MGPE / TecMinho / APOGEP Núcleo Norte, Portugal
2019/09/01 - 2020/01/17 Project Management Workshop 2020 (Workshop de Gestão de Projetos 2020) (2020/01/17 - 2020/01/17)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2019/10/16 - 2019/11/30 TOP#06 - Critical Thinking and Cognitive Pitfalls in Decision Making (O Pensamento Crítico e as Armadilhas Cognitivas na Tomada de Decisão) (Wantuir Felippe da Silva Junior). (2019/11/11 - 2019/11/11)
Oficina (workshop) (Coorganizador)
Partnership MGPE / TecMinho / APOGEP Núcleo Norte, Portugal
2019/10/01 - 2019/11/15 TOP#05 - Improve GP with Lean and Process Analysis Techniques (Melhorar a GP com Técnicas Lean e de Análise de Processos) (José António Faria) (2019/10/29 - 2019/10/31)
Oficina (workshop) (Coorganizador)
Partnership MGPE / TecMinho / APOGEP Núcleo Norte, Portugal
2019/09/01 - 2019/10/15 TOP#04 - Communication and Digital Marketing in a Project Environment (Comunicação e Marketing Digital em Ambiente de Projeto) (Paulo Sousa e Maria Angélica Castellani). (2019/10/01 - 2019/10/01)
Oficina (workshop) (Coorganizador)
Partnership MGPE / TecMinho / APOGEP Núcleo Norte, Portugal
2019/06/01 - 2019/07/15 TOP#03 - Project Control (Cost, Time and Scope) / Controlo de Projetos (Custo, Tempo e Âmbito) (Paulo Sousa e Anabela Tereso). (2019/07/02 - 2019/07/04)
Oficina (workshop) (Coorganizador)
Partnership MGPE / TecMinho / APOGEP Núcleo Norte, Portugal
2019/03/01 - 2019/06/01 TOP#02 - Risk Management in Projects - Three Approaches, One Objective (A Gestão do Risco nos Projetos - Três Abordagens, Um Objetivo) (Hélio Costa, Vitor Casimiro da Costa e David Martins) (2019/05/29 - 2019/05/30)
Oficina (workshop) (Coorganizador)
Partnership MGPE / TecMinho / APOGEP Núcleo Norte, Portugal
2019/04/12 - 2019/04/13 TOP#01 - Design Thinking in Project Management Workshop (Hugo Gonçalves). (2019/04/12 - 2019/04/13)
Oficina (workshop) (Coorganizador)
Partnership MGPE / TecMinho / APOGEP Núcleo Norte, Portugal
2019/03/20 - 2019/03/20 TOP (Toghether On Projects) Program Presentation Event (2019/03/20 - 2019/03/20)
Oficina (workshop) (Coorganizador)
Partnership MGPE / TecMinho / APOGEP Núcleo Norte, Portugal
2019 - 2019 Project Management Workshop 2019 (Workshop de Gestão de Projetos 2019) (2019 - 2019)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2018 Project Management Workshop 2018 (Workshop de Gestão de Projetos 2018) (2018 - 2018)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2018 - 2018 ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation (2018)
Conferência (Membro da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2017 - 2017 Project Management Workshop 2017 (Workshop de Gestão de Projetos 2017) (2017 - 2017)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2016 Project Management Workshop 2016 (Workshop de Gestão de Projetos 2016) (2016 - 2016)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2016 - 2016 ICOPEV 2016 - 3rd International Conference on Project Evaluation (2016)
Conferência (Membro da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2014 - 2014 Project Management Week 2014 (Semana de Gestão de Projetos 2014) (2014 - 2014)
Oficina (workshop) (Presidente da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2014 - 2014 ICOPEV 2014 - 2nd International Conference on Project Evaluation (2014)
Conferência (Membro da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2013 - 2013 1st International Congress on Energy & Environment (ICEE): bringing together Economics and Engineering (2013)
Congresso (Membro da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2012 - 2012 Portugal - Brazil International Seminar: Electric Sector Diversities and Strategies (Seminário Internacional Portugal - Brasil: Diversidades e Estratégias do Setor Elétrico) (2012)
Seminário (Membro da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal
2011 - 2011 ICOPEV 2011 - 1st International Conference on Project Economic Evaluation (2011)
Conferência (Membro da Comissão Organizadora)
Universidade do Minho - Campus de Azurém, Portugal

Júri de grau académico

Tema
Tipo de participação
Nome do candidato (Tipo de grau)
Instituição / Organização
2023/03/23 Unlocking the full potential of Near-shoring: A matured model of proximity offshoring for professional services
Arguente
Jorge Fernando Alves Guedes (Doutoramento)
ISCTE-Instituto Universitário de Lisboa, Portugal
2022/12/15 Prospective Project Management following the PMBOK Guide with BIM integration in Construction Projects (Prospectiva da Gestão de Projectos seguindo o Guia PMBOK com integração do BIM nos Projectos de Construção)
Presidente do júri
Manuel Gomes Ferreira (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2022/09 Links between Innovation Management Practices and Project Management: a systematic literature review (Ligações entre as Práticas de Gestão de Inovação e Gestão de Projetos: uma revisão sistemática da literatura)
Arguente
José Carlos Junqueira Martins (Mestrado)
Universidade de Coimbra Departamento de Engenharia Mecânica, Portugal
2022/02/18 Data Science - Creating Management Support Tools (Data Science - Criação de Ferramentas de Apoio à Gestão)
Arguente principal
Igor Ludgero Taborda Felgueiras dos Santos (Mestrado)
Universidade do Minho Departamento de Eletrónica Industrial , Portugal
2021/11/05 Study of a Multi-Project Management Support Tool (MSProject) (Estudo de uma Ferramenta de Auxilio à Gestão de Multiprojetos (MSProject))
Arguente principal
Leandro José Ferreira Pinto (Mestrado)
Instituto Politécnico do Porto Instituto Superior de Engenharia do Porto, Portugal
2020/10/29 Event Project Management Model: An Environmentally Sustainable Approach to Quality Service Delivery (Modelo de Gestão de Projetos de Eventos: Uma Abordagem Ambientalmente Sustentável para a entrega de um Serviço de Qualidade)
Arguente
Andrómeda Goretti de Menezes Campos (Doutoramento)
Universidade do Minho Escola de Engenharia, Portugal
2020/10/26 Risk Management: case study from the food industry (Gestão de Riscos: estudo de caso da indústria alimentar)
Arguente principal
Matheus de Lima Pulier (Mestrado)
Universidade de Coimbra, Portugal
2020/04/16 Business Models Reinvention: from staffing to management consulting case
Arguente
Carlos Miguel Correia Hernandez Jerónimo (Doutoramento)
Instituto de Telecomunicações ISCTE-IUL, Portugal
2019/12/16 Proposal for Improving Risk Management Practices in Innovation Projects: case study (Proposta de Melhoria das Práticas de Gestão do Risco em Projetos de Inovação: caso de estudo)
Arguente
João Pedro de Faria Westwoog (Mestrado)
Universidade Nova de Lisboa Faculdade de Ciências e Tecnologia, Portugal
2019/11/14 Study and Analysis of an Automobile Workshop Service Catalog (Estudo e Análise do Catálogo de Serviços de uma Oficina Automóvel)
Arguente
Vasco Nuno Coutinho dos Santos (Mestrado)
Instituto Politécnico do Porto Instituto Superior de Engenharia do Porto, Portugal
2019/07/12 Linking Leadership to Project Success in IT Projects in the SMEs’ Manufacturing Industry: Case of Canada
Orientador
Lina Alshelh (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2019/07/11 Project and Portfolio Management: A Multilayer Framework to Support Innovation-Driven SMEs in the Industry of Construction and Building Materials. Case of Canada
Orientador
Mohamad Ali Mishly (Doutoramento)
Universidade do Minho - Campus de Azurém, Portugal
2018/12/07 Development of a metrics framework for agile projects (Desenvolvimento de uma framework de métricas para projetos ágeis)
Arguente
Luís Miguel Carvalho Correia (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018/11/22 Implementation in a startup of the principles of Lean Thinking and the Lean Startup approach (Implementação numa startup dos princípios do Lean Thinking e da abordagem Lean Startup)
Presidente do júri
Paulo Henrique Ribeiro Condeço (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2018/07/25 The Impact of Project Management on Competitiveness - Hypercompetitiveness Project (O Impacto da Gestão de Projetos na Competitividade - Projeto Hipercompetitividade)
Arguente
Cláudia Sofia dos Anjos Pereira (Mestrado)
Universidade de Aveiro, Portugal
2017/12/15 Applying Earned Value Management to the Scrum Methodology (Aplicação do Earned Value Management na Metodologia Scrum)
Arguente
Manuel Alberto Araújo Martins da Silva (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2017/07/03 Resilience in Small and Medium-Sized Organizations (Resiliência nas Organizações do tipo Pequenas e Médias Empresas)
Arguente
Gisele Rodrigues (Outro)
Universidade do Minho - Campus de Azurém, Portugal
2016/12/28 Analysis of the Application of the EVM Method in IT Projects (Análise da Aplicação do Método EVM em Projetos de TI)
Arguente
Cláudia Alexandra Cruz Gonçalves (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2015/11/17 Proposal for the Implementation of Control Charts in Project Management by the Critical Chain (Proposta de Implementação de Cartas de Controlo na Gestão de Projetos pela Cadeia Crítica)
Arguente
Flávio Augusto Rocha Cardoso (Mestrado)
Universidade Nova de Lisboa Faculdade de Ciências e Tecnologia, Portugal
2013/11/28 Demand Analysis and Forecasting in a Distribution Company (Análise e Previsão da Procura numa Empresa de Distribuição)
Presidente do júri
Lara Raquel Miranda Santos (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2013/11/15 EmpreendeTIMOR Project: a Contribution for the Promotion of Entrepreneurship in Timor-Leste (Projeto EmpreendeTIMOR: um Contributo para a Promoção do Empreendedorismo em Timor-Leste)
Presidente do júri
Tomás Soares Xavier (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2013/03/04 Proposal of a support system to the software project management process in a company in Manaus (Proposta de um sistema de apoio ao processo de gestão de projetos de software numa empresa de Manaus)
Arguente
Marcelo Silva Pereira (Mestrado)
Universidade do Minho - Campus de Azurém, Portugal
2013 Resource Complementarity Analysis: Relevance for Activity Networks (Análise da Complementaridade de Recursos: Relevância para Redes de Atividades)
Orientador
Helder Cruz da Silva (Doutoramento)
Universidade do Minho, Portugal
2012 Vehicle Routing Problems - Research and Construction of a Geographic Information System (Investigação e Construção de um Sistema de Informação Geográfica)
Arguente
João Afonso Vieira Casal (Mestrado)
Universidade do Minho, Portugal
2011 Applying Lean Services techniques in the operating room of a hospital (Aplicação de técnicas Lean Services no bloco operatório de um hospital)
Arguente
Ivo Alexandre Pereira de Carvalho de Oliveira Matos (Mestrado)
Universidade do Minho, Portugal
2010 Heuristic Methods Applied to Forest Logistics Management (Métodos Heurísticos Aplicados à Gestão Logística Florestal)
Arguente
Luís Miguel Ribeiro Gonçalves (Mestrado)
Universidade do Minho, Portugal
2010 Project Cell: the cellular organization of the building design process (Célula de Projectos: a organização celular do processo de projecto de edifícios)
Arguente
André Luís Aquere de Cerqueira e Sousa (Doutoramento)
Universidade do Minho, Portugal
2008 Electricity Power Planning in Portugal: the role of wind energy
Arguente
Paula Fernanda Varandas Ferreira (Doutoramento)
Universidade do Minho, Portugal
2008 Reconfiguration of product-oriented production systems - an industrial case study (Reconfiguração de sistemas de produção orientados ao produto - estudo de um caso industrial)
Arguente
Alexandre Cabral Miranda de Almeida Cardoso (Mestrado)
Universidade do Minho, Portugal
2008 Applying Multi-Mode Models for Construction Project Management (Aplicação de Modelos Multi-Modo para a Gestão de Projectos de Construção)
Arguente
Miguel Rui Vieira de Faria Neto (Mestrado)
Universidade de Coimbra, Portugal

Arbitragem científica em conferência

Nome da conferência Local da conferência
2023 - 2023 WorldCIST’23 - 11th World Conference on Information Systems and Technologies Pisa, Italy
2022 - 2022 PM Symposium 2022 PMI Portugal
2022 - 2022 WorldCist'22 - 10th World Conference on Information Systems and Technologies
2021 - 2021 WorldCist'21 - 9th World Conference on Information Systems and Technologies
2020 - 2020 ICOPEV 2020 - 5th International Conference on Production Economics and Project Evaluation Polytechnic Institute of Castelo Branco
2019 - 2019 WorldCIST'19 - 7th World Conference on Information Systems and Technologies La Toja Island, Galicia
2019 - 2019 WorldCIST'20 - 8th World Conference on Information Systems and Technologies Budva, Montenegro
2018 - 2018 WorldCIST'18 - 6th World Conference on Information Systems and Technologies Naples, Italy
2018 - 2018 ICOPEV 2018 - 4th International Conference on Production Economics and Project Evaluation Universidade do Minho
2017 - 2017 12th International Forum on Knowledge Asset Dynamics St. Petersburg, Russia
2017 - 2017 WorldCist'17 - 5th World Conference on Information Systems and Technologies Ilha de Porto Santo, Madeira
2016 - 2016 26th IBIMA Conference (IBIMA2016) Madrid, Spain
2016 - 2016 ICOPEV 2016 - 3nd International Conference on Project Evaluation Universidade do Minho
2016 - 2016 WorldCIST'16 - The 4th World Conference on Information Systems and Technologies
2015 - 2015 WorldCIST'15 - The 3rd World Conference on Information Systems and Technologies São Miguel, Açores
2014 - 2014 ICOPEV 2014 - 2nd International Conference on Project Evaluation Universidade do Minho
2013 - 2013 XVI Congresso da Associação Portuguesa de Investigação Operacional - IO2013 Bragança, Portugal
2012/07/01 - 2012/07/05 International Conference on Engineering Optimization 2012 Rio de Janeiro, Brasil
2011 - 2011 ICOPEV 2011 - 1st International Conference on Project Economic Evaluation Universidade do Minho
2009 - 2009 CIE39 - International Conference on Computers & Industrial Engineering Troyes, France
2007 - 2007 International Conference on Industrial Engineering and Systems Management 2007 Beijing, China

Arbitragem científica em revista

Nome da revista (ISSN) Editora
2022 - Atual Sustainability
2018 - 2018 IEEE Access IEEE - Institute of Electrical and Electronics Engineers
2011/02/20 - 2018 The Open Cybernetics and Systemics Journal Bentham Science Publishers Ltd.
2016 - 2016 Computers & Operations Research Elsevier
2016 - 2016 Pacific Journal of Optimization Yokohama Publishers
2014 - 2014 International Journal of Production Research International Foundation for Production Research (IFPR)
2011 - 2011 Information Technology Research Journal IGI Global
2011 - 2011 International Journal on Artificial Intelligence Tools World Scientific
2007 - 2007 Journal of Operations and Logistics I4e2

Comissão de avaliação

Descrição da atividade
Tipo de assessoria
Instituição / Organização Entidade financiadora
2018 - 2018 Member of the evaluation panel (FWO Expert Panel: Economics, Business Economics and Management) of a research project New Research Project Proposal, submitted in March 2018 to the FWO - Research Foundation Flanders - Belgium.
Avaliador
Research Foundation - Flanders (FWO), Bélgica Research Foundation - Flanders (FWO), Bélgica
2017 - 2017 Member of the evaluation panel of a Postdoctoral Fellow application research project, submitted in February 2017 to the FWO Research Foundation Flanders - Belgium.
Avaliador
Research Foundation - Flanders (FWO), Bélgica Research Foundation - Flanders (FWO), Bélgica
2014 - 2014 Member of the evaluation panel of a Pegasus - Short research project, submitted in February 2014 to the FWO Research Foundation Flanders - Belgium.
Avaliador
Research Foundation - Flanders (FWO), Bélgica Research Foundation - Flanders (FWO), Bélgica

Consultoria / Parecer

Descrição da atividade Instituição / Organização
2022 - Atual ANI Incentive System Activity Planning Study (Estudo do Planeamento de Atividades do Sistema de Incentivos da ANI) Agência Nacional de Inovação SA, Portugal
2014/01/04 - 2014/12/30 Participation in the "Project OPM3 Portugal: maturity analysis of the project management function", with Computer Graphics Center. Provision of services to the company Ambithus in the scope of the OPM3 Project (Participação no "Projeto OPM3 Portugal: Análise de maturidade da função de gestão de projetos", com Centro de Computação Gráfica. Prestação de serviços à empresa Ambithus no âmbito do Projeto OPM3) Ambithus Consulting, Portugal

Curso / Disciplina lecionado

Disciplina Curso (Tipo) Instituição / Organização
2021 - Atual Integrated Project Management (Gestão Integrada de Projetos) Master in Biotechnology / Master in Chemical and Biological Engineering (Mestrado em Biotecnologia / Mestrado em Engenharia Química e Biológica) Universidade do Minho, Portugal
2021 - Atual Industrial Project Management (Gestão de Projetos Industriais) Master in Industrial Engineering and Management (Mestrado em Engenharia e Gestão Industrial) Universidade do Minho, Portugal
2021 - Atual Integrated Project Management (Gestão Integrada de Projetos) Master of Engineering and Operations Management (Mestrado em Engenharia e Gestão de Operações) Universidade do Minho, Portugal
2016 - Atual Research Methods in Engineering Project Management (Métodos de Investigação em Gestão de Projetos de Engenharia) Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) Universidade do Minho - Campus de Azurém, Portugal
2015 - Atual Seminars in Engineering Project Management (Seminários em Gestão de Projetos de Engenharia) Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado) Universidade do Minho - Campus de Azurém, Portugal
2014 - Atual Integrated Project Management (Gestão Integrada de Projetos) Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) Universidade do Minho, Portugal
2007/09 - Atual Systems Analysis (Análise de Sistemas) Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado) Universidade do Minho, Portugal
2007/09 - Atual Decision Models and Methods (Modelos e Métodos de Decisão) Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado) Universidade do Minho, Portugal
2022 - 2022/01 Risk Analysis and Management (Análise e Gestão de Risco) Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) Universidade do Minho, Portugal
2001/09 - 2022/01 Risk Analysis and Management (Análise e Gestão de Risco) Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado) Universidade do Minho, Portugal
2015 - 2021 Project Scheduling (Escalonamento de Projetos) Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado) Universidade do Minho - Campus de Azurém, Portugal
2012 - 2021 Resource Allocation in Project Management Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento) Universidade do Minho - Campus de Azurém, Portugal
2009/09 - 2021 Integrated Project Management (Gestão Integrada de Projetos) Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado) Universidade do Minho, Portugal
2016 - 2020 Organizational Project and Change Management Doctoral Programme in Advanced Engineering Systems for Industry (AESI) (Doutoramento) Universidade do Minho, Portugal
2015 - 2020 Program and Portfolio Management (Gestão de Programas e Portfólios) Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado) Universidade do Minho - Campus de Azurém, Portugal
2006/09 - 2020 Decision Models (Modelos de Decisão) Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado) Universidade do Minho, Portugal
2016 - 2019 New Product Development Project Planning and Management (Planeamento e Gestão de Projetos de Desenvolvimento de Novos Produtos) Master in Product Engineering (Mestrado em Engenharia do Produto) (Mestrado) Universidade do Minho - Campus de Azurém, Portugal
2015 - 2019 Research Methods in Engineering (Métodos de Investigação em Engenharia) Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento) Universidade do Minho - Campus de Azurém, Portugal
2012/09 - 2019 Research Methods (Métodos de Investigação) Several Master Programs (Mestrado) Universidade do Minho, Portugal
2011 - 2019 Decision Analysis Models and Methods Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento) Universidade do Minho - Campus de Azurém, Portugal
2008/09 - 2019 Integrative Project - Decision Technologies (Projeto Integrador - Tecnologias de Decisão) Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado) Universidade do Minho, Portugal
2011 - 2017 Multicriteria Analysis Applied to Energy and Environmental Planning Doctoral Program in Industrial and Systems Engineering (Programa Doutoral em Engenharia Industrial e de Sistemas) (Doutoramento) Universidade do Minho, Portugal
2016 - 2016 Economic Evaluation of Projects and Risk Management (Avaliação Económica de Projetos e Gestão do Risco) Master in Engineering Project Management (Mestrado em Gestão de Projetos de Engenharia) (Mestrado) Universidade do Minho - Campus de Azurém, Portugal
2007/09 - 2016 Integrative Project - Systems Engineering (Projeto Integrador - Eng.ª Sistemas) Master in Systems Engineering (Mestrado em Engenharia de Sistemas) (Mestrado) Universidade do Minho, Portugal
2012/09 - 2013/07 Research Methodologies in Human Engineering (Metodologias de Investigação em Engenharia Humana) Master in Human Engineering (Mestrado em Engenharia Humana) (Mestrado) Universidade do Minho, Portugal
2013 - 2013 Seminars (Seminários) Master in Industrial Engineering (Mestrado em Engenharia Industrial) (Mestrado) Universidade do Minho, Portugal
2007/09 - 2012 Research Methodologies (Metodologias de Investigação) Several Master Programs (Mestrado) Universidade do Minho, Portugal
2006/09 - 2009/07 Economic Engineering I (Engenharia Económica I) Integrated Master in Biological Engineering (Mestrado Integrado em Engenharia Biológica) (Mestrado) Universidade do Minho, Portugal
2006/09 - 2009/01 Integrative Project I - PLE - Project Led Education (Projeto Integrado I - PLE) Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado) Universidade do Minho, Portugal
2007/09 - 2008/07 Decision Models (Modelos de Decisão) Bachelor of Applied Mathematics (Licenciatura em Matemática Aplicada) (Licenciatura) Universidade do Minho, Portugal
2003/09 - 2008/07 Elements of System Design (Elementos de Projeto de Sistemas) Degree in Systems Engineering and Computer Science (Licenciatura em Engenharia de Sistemas e Informática) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 2008/07 Cost Analysis (Análise de Custos) Degree in Civil Engineering (Licenciatura em Engenharia Civil) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 2008/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Degree in Civil Engineering (Licenciatura em Engenharia Civil) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 2007/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Degree in Production Engineering / Degree in Mechanical Engineering / Etc. (Licenciatura em Engenharia de Produção / Licenciatura em Engenharia Mecânica / Etc.) (Licenciatura) Universidade do Minho, Portugal
2006/09 - 2007 Cost Analysis I (Análise de Custos I) Integrated Master in Industrial Engineering and Management (Mestrado Integrado em Engenharia e Gestão Industrial) (Mestrado) Universidade do Minho, Portugal
2005/09 - 2006/07 Numerical Methods (Métodos Numéricos) Bachelor's Degree in Management Informatics (Licenciatura em Informática de Gestão) (Licenciatura) Universidade do Minho, Portugal
2005/09 - 2006/07 Numerical Methods (Métodos Numéricos) Bachelor in Electronic and Computer Engineering (Licenciatura em Engenharia Eletrónica e de Computadores) (Licenciatura) Universidade do Minho, Portugal
2003/09 - 2006/07 Elements of Systems Analysis and Design (Elementos de Análise e Projeto de Sistemas) Bachelor in Industrial Engineering and Management (Licenciatura em Engenharia e Gestão Industrial) (Licenciatura) Universidade do Minho, Portugal
2002/09 - 2006/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Bachelor in Industrial Engineering and Management (Licenciatura em Engenharia e Gestão Industrial) (Licenciatura) Universidade do Minho, Portugal
1997/09 - 2006/07 Decision Models (Modelos de Decisão) Bachelor in Industrial Engineering and Management (Licenciatura em Engenharia e Gestão Industrial) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 2004/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Degree in Apparel Engineering (Licenciatura em Engenharia do Vestuário) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 2004/07 Economic Engineering II (Engenharia Económica II) Degree in Apparel Engineering (Licenciatura em Engenharia do Vestuário) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 2004/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Degree in Textile Engineering (Licenciatura em Engenharia Têxtil) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 2004/07 Economic Engineering II (Engenharia Económica II) Degree in Apparel Engineering (Licenciatura em Engenharia Têxtil) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 2004/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Bachelor of Engineering in Industrial Electronics (Licenciatura em Engenharia Eletrónica Industrial) (Licenciatura) Universidade do Minho, Portugal
2002/09 - 2003/07 Construction Economics (Economia da construção) Master in Civil Engineering (Mestrado em Engenharia Civil) (Mestrado) Universidade do Minho, Portugal
1996/09 - 1999/07 Economic Engineering I (Engenharia Económica I) Degree in Systems Engineering and Computer Science (Licenciatura em Engenharia de Sistemas e Informática) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 1999/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Bachelor's Degree in Production Engineering (Licenciatura em Engenharia de Produção) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 1999/07 Economic Engineering I (Engenharia Económica I) Bachelor's Degree in Production Engineering (Licenciatura em Engenharia de Produção) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 1999/07 Economic Engineering II (Engenharia Económica II) Bachelor's Degree in Production Engineering (Licenciatura em Engenharia de Produção) (Licenciatura) Universidade do Minho, Portugal
1995/09 - 1999/07 Decision Models (Modelos de Decisão) Bachelor's Degree in Production Engineering (Licenciatura em Engenharia de Produção) (Licenciatura) Universidade do Minho, Portugal
1996/09 - 1998/07 Economic Engineering II (Engenharia Económica II) Degree in Systems Engineering and Computer Science (Licenciatura em Engenharia de Sistemas e Informática) (Licenciatura) Universidade do Minho, Portugal
1996/09 - 1997/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Bachelor of Science in Materials Engineering (Licenciatura em Engenharia dos Materiais) (Licenciatura) Universidade do Minho, Portugal
1996/09 - 1997/07 Industrial Cost Analysis I (Análise de Custos Industriais I) Bachelor in Applied Physics - Optics Branch (Licenciatura em Física Aplicada - Ramo Ótica) (Licenciatura) Universidade do Minho, Portugal

Membro de associação

Nome da associação Tipo de participação
2020/07/21 - Atual Project Management Portuguese Observatory (Observatório Português de Gestão de Projetos) Coordinator
2020/07/02 - Atual APOGEP - Portuguese Association of Project Management (APOGEP - Associação Portuguesa de Gestão de Projetos) Member
2020/05 - Atual PM2 Alliance Advisory Committee Member
2012 - Atual APOGEP Certification Program Scheme Committee Member
2012 - Atual APOGEP Council of Representatives Member
2011/01 - 2013 Project Management Institute Member

Membro de comissão

Descrição da atividade
Tipo de participação
Instituição / Organização
2019 - Atual Expert at the Technical Commission 175 (CT175) - PROJECT MANAGEMENT, Technical Commission for Standardization in Project Management, Programs and Portfolios of IPQ - Portuguese Institute of Quality / ISO - International Organization for Standardization.
Consultor
Instituto Português da Qualidade, Portugal
2014 - Atual Board Member of the Master in Engineering Project Management
Membro
Universidade do Minho - Campus de Azurém, Portugal
2020/09/01 - 2022/08/31 Director of Master in Engineering Project Management
Diretor
Universidade do Minho - Campus de Azurém, Portugal
2014 - 2016 Director of Master in Engineering Project Management
Diretor
Universidade do Minho - Campus de Azurém, Portugal
2013 - 2014 Board Member of the Master in Industrial Engineering
Membro
Universidade do Minho - Campus de Azurém, Portugal
Distinções

Prémio

2019 Best Master's Dissertation in Engineering Project Management - award given to Bruno Rodrigues supervised by Anabela Tereso
Universidade do Minho Departamento de Produção e Sistemas, Portugal
2018 Best Master's Dissertation in Engineering Project Management - award given to Sofia Carvalho supervised by Anabela Tereso
Universidade do Minho Departamento de Produção e Sistemas, Portugal
2017 The Brightest Team Motivation Management 2017
2015 EDP re:dy Challenge
EDP, Portugal

Título

2013 Certified Project Management Associate IPMA - Level D
Apogep - Associação Portuguesa de Gestão de Projectos., Portugal